STEP 5
(Powerside Runway Installation)
1. Locate the POWERSIDE RUNWAY, easily identified by
the Cylinder and Sheave roller mounting structures welded
on the underside. The Powerside Runway will be positioned
on the side of the lift where the Power Unit is installed.
(See Fig. 5.1)
2. Install the Cylinder and Cable Block as shown. Ensure the
snap ring is installed on the cylinder rod. (See Fig. 5.2 - 5.3)
3. Remove any pre-installed CABLE SHEAVES and
SPACERS from the POWERSIDE RUNWAY making sure
to and pay attention to the order in which they are removed.
(This will help at the time of re-installation.) First remove
the Retaining Pin then press the Sheave Axle through the
Runway completely until the Sheaves and Spacers are
removed. (See Fig. 5 4)
4. Position the POWERSIDE RUNWAY on top of the Cross
Tubes with the UTILITY RAIL towards the center. The fitting
holes located at the side of the Powerside Runway should be
adjacent the POWER UNIT COLUMN. Align the holes in the
Runway with the holes on the Cross Tubes and bolt together
using four M18 x 2.5 hex bolts and washers. (See Fig. 5.5)
STEP 6
(Offside Runway Installation)
1. Position the OFFSIDE RUNWAY on top of the Cross
Tubes with the UTILITY RAIL located inside.
(See Fig. 6.1)
STEP 7
(Sheave Installation)
15
DANGER !
DO NOT PROCEED
with Cable installation or go near the
lift work area unless visual confirmation is made of ALL
Safety Locks. ALL locks MUST be engaged before proceed-
ing. Failure to comply with these instructions may result in
severe personal injury or death. (See page 26.)
Fig. 5.4
Fig. 5.5
Fig. 6.1
Fig. 5.2
Cable Block
Cable Block
Cable
Retainer
Cylinder
Guide
Thread nut until snap
ring can be installed.
Utility
Rail
Cylinder
Fig. 5.3
Fig. 5.1