7. Each cable must be installed through the CABLE RETAINER
first to keep Cables stowed in their proper position on the Cable
Block. (See Fig. 7.7)
8. Route the Cable ends through the ends of each Cross
Tube, over the SLACK SAFETY SHEAVE then to the top
of each column. Secure using the M30 Hex Nuts and Flat
Washers. Tighten each nut until there is at least one inch of
threads protruding through the top of the nut. The Cables
will remain loose until start up and final Cable adjustments
are made. (See Fig. 7.8 & 7.9)
9. After routing the Cables double-check to make sure all are
properly positioned and REMAIN WITHIN THE GROOVES
of ALL Sheaves. (See Fig. 7.10. & 7.11)
18
DANGER !
Failure to route Lifting Cables as described may lead
to serious personal injury and/ or death to operator or
bystander and/ or may cause damage to property.
DANGER!
Lifting Cables routed through the Cross Tubes must
run BELOW the Cross Tube Mounting Bolts. Serious
damages or injury can occur if Cables are not routed
correctly. (See Fig 7.12)
Fig. 7.7
Fig. 7.8
Fig. 7.10
Fig. 7.11
Fig. 7.12
Fig. 7.9
Install each nut until 1” MIN
of threads are exposed
Lifting Cable
Cable Block
Cable
Retainer
Cable Plug
End
Cylinder
Guide
Thread nut until snap
ring can be installed.