19
STEP 8
(Power Unit Installation)
1. Mount the POWER UNIT to the Mounting Bracket using
the M10 Hex Bolts and Nylock nuts then FILL THE RES-
ERVOIR with 20-quarts of 10-WT hydraulic oil or Dexron
automatic transmission fluid. (See Fig. 8.1)
STEP 9
(Routing Hydraulic Hoses)
1. Install the 90-degree Hydraulic Fitting to the POWER
PORT and the 90° Air Line Compression Fitting to the
RETURN PORT of the Power Unit and connect the Hoses
as described below. It will be necessary to remove the ship-
ping plugs from both ports prior to installing the Fittings. On
the pipe thread side of the fitting it is recommended to use
Teflon tape or pipe sealer. DO NOT USE TEFLON TAPE on
the JIC flared end
.
It will be necessary to remove the ship-
ping plugs from both ports prior to installing the fittings.
(See Fig. 9.1 -9.2
2. Remove the captive nut on the Compression Fitting.
Insert the Plastic Air line through the alignment sleeve and
into the end of the fitting until it bottoms out. Then tighten
the nut on the fitting. (See Fig 9.3)
DANGER !
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
NOTE:
POWER AND RETURN PORT LOCATIONS MAY
VARY. CONFIRM POWER AND RETURN PORT
LOCATIONS IN POWER UNIT DOCUMENTATION
OR CONTACT TECHNICAL SUPPORT.
DANGER!
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/ OR INSTALLATION
PROCEDURES ARE COMPLETED.
Fig. 9.1
Fig. 9.2
Fig. 8.1
90° Air Line
Compression
Fitting
90° O-Ring
Fitting
Power Port
Return Port
Remove
Shipping Plugs
Install Fittings