HD-14T Four Post Lift
31
P/N 5900037 — Rev. F — February 2022
4.
Bolt both Runways into place, two Hex Head Bolts on each end of the Runways.
Drawing shows how to
secure the Runways to the
Crosstubes.
Two Bolts on each end of the
Runway.
Not all components shown
.
Important
: The Offside Runway
must
be bolted on both ends when using Rolling Jack.
5.
Make sure that the Primary Locks are engaged.
⚠
WARNING
Do not continue with the installation until you have visually confirmed that all four
Safety Locks are engaged. If they are not engaged, the Runways could move or
fall, possibly causing personal injury or product damage.
Before routing the Cables, extend the Piston on the Hydraulic Cylinder.
To extend the Piston
:
Remove the Shipping Plug from the Return Line Connector. The Return Line Connector is on the
Cylinder end closest to where the Power Unit will be.
6.
Attach an air pressure source to the Return Line Connector.
7.
Use the air pressure to extend the Hydraulic Cylinder’s Piston and Retainer Plate.
Do not exceed
50 psi
.
Summary of Contents for HD-14T
Page 7: ...HD 14T Four Post Lift 7 P N 5900037 Rev F February 2022 Components ...
Page 9: ...HD 14T Four Post Lift 9 P N 5900037 Rev F February 2022 Specifications ...
Page 67: ...HD 14T Four Post Lift 67 P N 5900037 Rev F February 2022 Wiring Diagrams ...
Page 68: ...HD 14T Four Post Lift 68 P N 5900037 Rev F February 2022 Labels ...
Page 69: ...HD 14T Four Post Lift 69 P N 5900037 Rev F February 2022 ...
Page 70: ...HD 14T Four Post Lift 70 P N 5900037 Rev F February 2022 ...
Page 71: ...HD 14T Four Post Lift 71 P N 5900037 Rev F February 2022 Parts Drawings ...
Page 72: ...HD 14T Four Post Lift 72 P N 5900037 Rev F February 2022 ...
Page 73: ...HD 14T Four Post Lift 73 P N 5900037 Rev F February 2022 ...
Page 75: ...HD 14T Four Post Lift 75 P N 5900037 Rev F February 2022 Maintenance Log ...