![Belmont Bel-Nova AL-D101G Installation Instructions Manual Download Page 27](http://html1.mh-extra.com/html/belmont/bel-nova-al-d101g/bel-nova-al-d101g_installation-instructions-manual_2730286027.webp)
(3) Installation Instructions
1. Lead out the power supply cable from the ceiling
where the track light is mounted.
2. Run the power supply cable through the pallet and
mount the pallet.
3. Place track against the pallet and slightly engage two
hex bolts (M8 x 25, plated) and two flat washers
(M8, plated) at the end opposite to the electrical
opening.
4. Allowing the free end to hang down slightly for
access, install the conduit box connector to the track.
5. Attach the track to the pallet.
Fix the track with six hex bolts (M8 x 25, plated) and six flat
washers (M8, plated).
6. Connect the wires from the feed to the terminal block.
7. Attach track pole to trolley.
Place the trolley collar over the trolley connector, screw the
track pole onto the trolley connector, then fix the pole with
two set screws (M5×6, plated).
8. Attach the pole joint to the light.
Screw the pole joint into the end of the balance arm of the
light, and fix the pole joint with two set screws (M5×6,
plated).
Track pole
Trolley collar
(2)
(3)
①
3 Installation
(1)
(2)
Trolley connector
27
Summary of Contents for Bel-Nova AL-D101G
Page 1: ...Bel Nova INSTALLATION INSTRUCTIONS...
Page 55: ...NOTE...