9
INSTRUCTIONS FOR THE INSTALLER
Once these checks have been completed, if the
regulator still fails to perform in a satisfactory
manner it should be replaced.
Electrical connection
The appliance is supplied with a standard 10
Amp service cord terminated by a 3-pin plug for
connection to a standard household socket. The
electrical supply is required to power the electronic
ignition system.
NOTE
: It will be necessary for servicing purposes
to disconnect the electrical power supply. The
power point should therefore be accessible after
the appliance is installed, as specified in the local
wiring regulations.
TESTING APPLIANCE OPERATION
After installation the installer must fully test the
appliance and ensure it operates correctly before
handing it over to the customer.
GAS CONVERSIONS AND ADJUSTMENTS
Data Label
A duplicate Data Label is supplied to adhere in an
accessible area next to the appliance.
This appliance is suitable for Natural Gas and
Universal LPG; ensure that the available gas supply
matches the Data Label.
When converting from Natural Gas to Universal
LPG ensure that the NG regulator is removed
and replaced with the Test Point Assembly. An
AGA Approved gas regulator suitable for a supply
pressure of 2.75kPa should be part of the gas
tank supply and the test point pressure should be
adjusted to 2.75kPa.
Replacing the injectors
If the equipment is adjusted for a type of gas that is
different from the one available, it is necessary to
replace the burner injectors.
The choice of the injectors to replace must be
made according to the table of the “technical
characteristics” as enclosed.
Act as follows:
– remove the racks and burners.
– by means of a straight spanner L, unscrew the
injectors U (fig.7 - 7/A) and substitute it with the
corresponding one
– tighten the injectors strongly.
After changing the injectors, it is necessary to
eliminate residual natural gas in the system.
To do this you have to turn to the maximum
position then press the knob of each burner and
wait few seconds.
Adjusting the burners
The lowest flame point must always be properly
adjusted and the flame must remain on even if
there is an abrupt shift from the maximum to the
minimum position.
If this is not so, it is necessary to adjust the lowest
flame point as follows:
– start the burner up
– turn the tap up to the minimum position (small
flame)
– remove the knob from the tap rod
– introduce a flat-tip screwdriver in the hole F of the
tap (fig.8) and turn the by-pass screw up to a
proper adjustment of the lowest flame point.
completed by a suitably qualified person.
The connection to the terminal board must by
according to below and as shown in fig.9:
brown cable L
blue cable N
green-yellow cable
(phase)
(neutral)
(ground)
3x0.75mm
2
, type H05VV-F or H05RR-F, complying
U-LPG Adjustment
When adjusting the burners to operate with
U-LPG, the by-pass screw must be opened 1/4
turn from fully closed position for the Double
Ring Burner, and 1/8 of a turn from fully closed
position for all other burners.
NG Adjustment
When adjusting the burners to operate with
NG, the by-pass screw must be opened 3/8 of a
turn from fully closed position for the Auxiliary
and Semi Rapid Burner, 1/2 of a turn from fully
closed position for the Rapid burner and 1 1/8
of a turn from fully closed for the Wok Burner.
MAINTENANCE
Maintenance Schedule
No regular maintenance is required for the
hotplates except cleaning.
Replacing the power supply cable
If the power supply cable should be replaced,
it is necessary to use a cable with a section of
with the regulations in force. This must be