background image

Technical data sheet

NF24A-MOD

www.belimo.com

NF24A-MOD • en-us • 2022-03-15 • Subject to change

4 / 7

Service tools Description

Type

Service Tool, with ZIP-USB function, for programmable and 
communicative Belimo actuators, VAV controller and HVAC performance 
devices

ZTH EU

Belimo PC-Tool, Software for adjustments and diagnostics

MFT-P

Adapter for Service-Tool ZTH

MFT-C

Connection cable 16 ft [5 m], A: RJ11 6/4 ZTH EU, B: 6-pin for connection to 
service socket

ZK1-GEN

Connection cable 16 ft [5 m], A: RJ11 6/4 ZTH EU, B: free wire end for 
connection to MP/PP terminal

ZK2-GEN

Electrical installation

Supply from isolating transformer.
The wiring of the line for BACnet MS/TP / Modbus RTU is to be carried out in accordance with 
applicable RS485 regulations.
Modbus / BACnet: Supply and communication are not galvanically isolated. Connect earth signal 
of the devices with one another.

Wiring diagrams
BACnet MS/TP / Modbus RTU

Cable colors:
1= black
2 = red
3 = white
5 = orange
6 = pink
7 = grey
BACnet / Modbus signal 
assignment:

C1 = D– = A

C2 = D+ = B

Connection with passive sensor, e.g. Pt1000, Ni1000, NTC

1) depending on type
2) Resolution 1 Ohm
Compensation of the measured 
value is recommended

Connection with active sensor, e.g. 0...10 V @ 0...50°C

Possible voltage range:
0...32 V (resolution 30 mV)

Summary of Contents for NF24A-MOD

Page 1: ...Modbus see interface description MP Bus max 8 Functional data Torque motor 90 in lb 10 Nm Torque Fail Safe 10 Nm Operating range Y 2 10 V Operating range Y variable 0 5 10 V Position feedback U 2 10 V...

Page 2: ...pecially in aircraft or in any other airborne means of transport Outdoor application only possible in case that no sea water snow ice insolation or aggressive gases interfere directly with the actuato...

Page 3: ...tically stops when the end stop is reached The first time the supply voltage is switched on i e at the time of commissioning the actuator carries out a synchronization The synchronization is in the ho...

Page 4: ...connection to MP PP terminal ZK2 GEN Electrical installation Supply from isolating transformer The wiring of the line for BACnet MS TP Modbus RTU is to be carried out in accordance with applicable RS...

Page 5: ...15 Subject to change 5 7 Connection with switching contact e g p monitor Requirements for switching contact The switching contact must be able to accurately switch a current of 16 mA 24 V Modbus RTU B...

Page 6: ...ommunication Service plug For connecting parametrisation and service tools Operating elements The manual override locking switch and direction of rotation switch elements are available on both sides S...

Page 7: ...th Min 85 Min 15 Clamping range Further documentation Tool connections BACnet Interface description Modbus Interface description Overview MP Cooperation Partners MP Glossary Introduction to MP Bus Tec...

Reviews: