30
Installation BAT867-R
Release 10 09/2021
To mount the device onto a horizontally mounted 35 mm DIN rail according
to DIN EN 60715, proceed as follows:
Slide the upper snap-in guide of the device into the DIN rail.
Pull the rail lock slide down using a screwdriver, and press the lower part
of the device against the DIN rail.
Snap in the device by releasing the rail lock slide.
2.2.2
Grounding the device
Prerequisite:
Use a wire diameter for the functional earth conductor that is no smaller
than the diameter of the supply voltage connection, however of at least
0.5 mm² (AWG20).
Proceed as follows:
Ground the device via the functional earth screw.
The functional earth screw is located on the topside as shown in the
illustration.
Summary of Contents for Hirschmann BAT867-R
Page 57: ...Installation BAT867 R Release 10 09 2021 57...
Page 58: ......