11.2 Disassembly work
For disassembly to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have been
completed.
Prerequisites
Tools
Material
Protective equipment
• Screwdriver - cross-head
size 2.5 mm
• none
•
Protective gloves (fluid-
resistant)
•
Safety goggles with side shields
•
Hearing protection
•
Respiratory protection,
protection class FFP 3
•
Safety footwear
Preparation of installation
1.
Open the bypass pipe if available
Figure
Description
1.
1.
1. Close the shut-off valves upstream and downstream
of the filter or the respective system section,
depressurise the filter and secure the system against
unintentional application of pressure
2. When the BEKOMAT
®
is used, it must be disconnected
from the filter base
For further information see the enclosed installation and
operating manual for the BEKOMAT
®
CLEARPOINT
®
3
eco
coalescing filter
Installation and operation manual
42 | 56