13.2 Dismantling work
For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
• Spanner or adjustable end wrench
• No material necessary
Always to be worn:
Preparatory tasks
1.
Decommissioning has been completed.
2.
Depressurise the pressurised system or the respective system section and secure it against unintentional
pressurisation.
Dismantling work
Illustration
Description / explanation
X3
X2
X3
F
F
X2
X4
X4
23
23
1. Remove the hose
[X4]
from the hose connection
[23]
and disassemble.
2. Remove the condensate inlet line
[X2]
and the
recommended shut-off valve
[X3]
from the condensate
inlet
[F]
and disassemble.
3. Disassemble all power supplies.
BEKOMAT
®
12i / 12i CO / 12i CO PN63
Original installation and operation manual
68 | 76