BEKA FOUNDATION BA614DF-F Instruction Manual Download Page 2

2

1.  Description

1.1  Documentation

2.  System Design

3.  Installation

3.1

Location

3.2  Installation procedure
3.3

EMC

4.  Maintenance

4.1  Fault finding during commissioning
4.2  Fault finding after commissioning
4.3  Servicing
4.4  Routine maintenance
4.5  Guarantee
4.6  Customer comments

5. Accessories

5.1

Scale and Tag marking

5.2

Tag plate

5.3

Pipe mounting kits

5.4

Fieldbus Interface Guide

CONTENTS

The BA614DF-F is CE marked to show compliance with the  European EMC Directive 89/336/EEC

Summary of Contents for FOUNDATION BA614DF-F

Page 1: ...Issue 2 23 rd June 2011 BA614DF F FOUNDATION fieldbus Field mounting Fieldbus Indicator Issue 2 ...

Page 2: ...ding during commissioning 4 2 Fault finding after commissioning 4 3 Servicing 4 4 Routine maintenance 4 5 Guarantee 4 6 Customer comments 5 Accessories 5 1 Scale and Tag marking 5 2 Tag plate 5 3 Pipe mounting kits 5 4 Fieldbus Interface Guide CONTENTS The BA614DF F is CE marked to show compliance with the European EMC Directive 89 336 EEC ...

Page 3: ...EM DESIGN The BA614DF F Indicator is powered and communicates via the fieldbus which is connected to non polarised terminals 1 and 2 As shown in Fig 1 the instrument may be connected to any fieldbus segment which can supply the additional 13mA required to power the instrument Fig 1 Fieldbus system 3 INSTALLATION 3 1 Location The BA614DF F Fieldbus Indicator is housed in a robust IP66 glass reinfor...

Page 4: ...stall the required glands conduit fittings or blanking plugs Note The temporary dust seals fitted for transit do not maintain the IP66 protection of the BA614DF F enclosure d Connect the field wiring to the terminals as shown in Fig 3 e Replace the instrument terminal cover and evenly tighten the two A screws Fig 2 BA614DF F installation procedure 3 3 EMC The BA614DF F complies with the requiremen...

Page 5: ...ation after a few seconds the firmware version will be displayed prior to entering the operational mode 4 2 Fault finding after commissioning ENSURE PLANT SAFETY BEFORE STARTING MAINTENANCE If a BA614DF F fails after it has been functioning correctly the table shown in section 4 1 may help to identify the cause of the failure If this procedure does not reveal the cause of the fault it is recommend...

Page 6: ... the instrument enclosure 5 2 Tag plate The BA614DF F can be supplied with a blank or custom laser marked stainless steel plate secured by two screws to the front of the instrument enclosure This plate can accommodate 1 row of 9 alphanumeric characters 10mm high or 1 row of 11 alphanumeric characters 7mm high or 2 rows of 18 alphanumeric characters 5mm high 5 3 Pipe mounting kits Two pipe mounting...

Reviews: