Caution:
Batteries are required to be installed and charged within 90 days of shipment.
Batteries
Although the individual batteries are sealed and require only minimal maintenance, they should be
given a periodic inspection and electrical check. (Refer to schedule in log sheet provided inside front
door pocket) to ensure years of trouble-free service. Tightness of battery terminal connections should
be tested to recommended torque values. Battery Service Agreements are available by calling our toll
free number at (800-726-4316).
For information about battery environment specifications, see Table 4-3. To qualify for battery-warranty
replacement, you will need to show records of the battery maintenance history including battery
numbers, battery voltages (individual cells), terminal torque measurements and dates of maintenance.
Power Connections
Check for corrosion and connection integrity. Visually inspect wiring for discolored or cracked
insulation. Clean and/or re-torque as required.
All battery terminal connections must be tightened with the proper torque value set in accordance with
the torque value on the Battery Connection Diagram provided with each system.
Use the correct torque tool to tighten the terminal bolts shown on the drawings shipped with each
system. Use all hardware provided with the batteries.
Caution:
Torque all connections in accordance with specified values provided. Failure to do
so can create an unsafe condition or fire hazard.
Preventative maintenance programs are available through the Customer Service
representative.
Battery Terminals
Check for discoloration, corrosion, and connection integrity. Clean and tighten as necessary.
To access battery terminals: