Assembly
To Gas Supply Source
Step 01:
Keep gas supply source closed and
ENGINE SWITCH at OFF position.
Step 02:
Attached the gas pipeline to GAS INLET
and gas supply source.
Step 03:
tighten the clip at each end of gas pipeline
until it’s not easy to pull down from gas
pipeline and prevent gas leaking.
1.
All gas pipe joints should be fixed tightly before operating the machine.
2.
Usually check the joints and gas hose for leakage or breaks, replace the damaged if necessary.
3.
Change the gas pipeline for each 18 months use.
4.
LPG & Nature gas is extremely flammable and explosive.
Warning
!
Connect Gas Supply Source
12
Summary of Contents for BMG5
Page 36: ...Note 35...