
HAWKER BEECHCRAFT
190-01180-01
MODEL G58 BONANZA
Rev. 2
FAA APPROVED
Page 8 of 13
alternate airport must be flight planned based upon an LNAV
approach or available ground-based approach which the aircraft is
equipped to fly.
For flight planning purposes, in areas where SBAS coverage is not
available, the pilot must check RAIM availability. Within the United
States, RAIM availability can be determined using the Garmin
WFDE Prediction program, part number 006-A0154-01
(010-G1000-00) or later approved version with GARMIN GA36 and
GA37 antennas selected, or the FAA’s en route and terminal RAIM
prediction website: www.raimprediction.net, or by contacting a
Flight Service Station. Within Europe, RAIM availability can be
determined using the Garmin WFDE Prediction program or
Europe’s AUGER GPS RAIM Prediction Tool at
http://augur.ecacnav.com/augur/app/home. For other areas, use
the G1000 WFDE Prediction program. This requirement is not
necessary if SBAS coverage is confirmed to be available along the
entire route of flight. The route planning and WFDE prediction
program may be downloaded from the GARMIN G1000 website on
the internet. For information on using the WFDE Prediction
Program, refer to GARMIN WAAS FDE Prediction Program, part
number 190-00643-01, ‘WFDE Prediction Program Instructions’.
For flight planning purposes, operations within the U.S. National
Airspace System on RNP and RNAV procedures when SBAS
signals are not available, the availability of GPS integrity RAIM
shall be confirmed for the intended route of flight. In the event of a
predicted continuous loss of RAIM of more than five minutes for
any part of the intended route of flight, the flight must be delayed,
canceled, or re-routed on a track where RAIM requirements can be
met or a ground based navigation system can be used.
For flight planning purposes for operations within European
B-RNAV and P-RNAV airspace, if more than one satellite is
scheduled to be out of service, then the availability of GPS integrity
RAIM shall be confirmed for the intended flight (route and time). In
the event of a predicted continuous loss of RAIM of more than five
minutes for any part of the intended flight, the flight must be
delayed, canceled, or re-routed on a track where RAIM
requirements can be met or a ground based navigation system can
be used.
For flight planning purposes, operations where the route requires
Class II navigation the aircraft’s operator or pilot-in-command must
use the Garmin WFDE Prediction program to demonstrate that
Summary of Contents for Baron G58
Page 1: ......
Page 9: ......
Page 62: ...General Model G58 Section 1 1 26 THIS PAGE INTENTIONALLY LEFT BLANK May 2015 ...
Page 66: ...Model G58 2 4 May 2015 Section 2 THIS PAGE INTENTIONALLY LEFT BLANK Limitations ...
Page 138: ...Emergency Procedures Model G58 Section 3 3 30 THIS PAGE INTENTIONALLY LEFT BLANK April 2008 ...
Page 170: ...Model G58 4 4 June 2011 Section 4 Normal Procedures THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 198: ......
Page 228: ...Model G58 5 4 July 2014 Section 5 THIS PAGE INTENTIONALLY LEFT BLANK Performance ...
Page 247: ...Performance Section 5 Model G58 5 23 July 2014 ...
Page 249: ...Performance Section 5 Model G58 5 25 July 2014 ...
Page 250: ...Performance Model G58 Section 5 5 26 July 2014 ...
Page 259: ...Performance Section 5 Model G58 5 35 THIS PAGE INTENTIONALLY LEFT BLANK July 2014 ...
Page 264: ...Performance Model G58 Section 5 5 40 July 2014 ...
Page 265: ...Performance Section 5 Model G58 5 41 July 2014 ...
Page 275: ...Performance Section 5 Model G58 5 51 July 2014 ...
Page 278: ...Performance Model G58 Section 5 5 54 THIS PAGE INTENTIONALLY LEFT BLANK July 2014 ...
Page 288: ...Wt and Bal Equip List Model G58 Section 6 6 10 December 2009 ...
Page 289: ...Wt and Bal Equip List Section 6 Model G58 6 11 December 2009 ...
Page 310: ...Systems Description Model G58 Section 7 7 10 THIS PAGE INTENTIONALLY LEFT BLANK May 2015 ...
Page 312: ...Systems Description Model G58 Section 7 7 12 May 2015 ...
Page 313: ...Systems Description Section 7 Model G58 7 13 May 2015 ...
Page 355: ...Systems Description Section 7 Model G58 7 55 ENVIRONMENTAL SCHEMATIC May 2015 ...
Page 398: ...Systems Description Model G58 Section 7 7 98 THIS PAGE INTENTIONALLY LEFT BLANK May 2015 ...
Page 434: ...Supplements Model G58 Section 9 9 2 THIS PAGE INTENTIONALLY LEFT BLANK November 2005 ...
Page 437: ......
Page 443: ......
Page 448: ...FAA Approved 6 of 6 P N 36 590002 89 Issued April 2009 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 449: ......
Page 450: ......
Page 451: ......
Page 452: ......
Page 453: ......
Page 454: ......
Page 455: ......
Page 456: ......
Page 457: ......
Page 458: ......
Page 459: ......
Page 463: ......
Page 487: ......
Page 497: ......
Page 510: ......
Page 534: ......
Page 535: ......
Page 553: ......
Page 554: ......
Page 555: ......
Page 556: ......
Page 557: ......
Page 558: ......
Page 559: ......
Page 560: ......
Page 561: ......
Page 562: ......
Page 563: ......
Page 564: ......
Page 565: ......
Page 566: ......
Page 567: ......
Page 568: ......
Page 589: ...7 of 12 P N 58 590000 0089 Issued December 2014 ...
Page 592: ...10 of 12 P N 58 590000 0089 Issued December 2014 ...
Page 594: ...12 of 12 P N 58 590000 0089 THIS PAGE INTENTIONALLY LEFT BLANK Issued December 2014 ...
Page 595: ......
Page 596: ......
Page 597: ......
Page 598: ......
Page 599: ......
Page 600: ......
Page 601: ......
Page 602: ......
Page 603: ......
Page 604: ......
Page 605: ......
Page 606: ......
Page 607: ......
Page 608: ......
Page 609: ......
Page 610: ......
Page 611: ......
Page 612: ......
Page 613: ......
Page 614: ......
Page 615: ......
Page 616: ......
Page 617: ......
Page 618: ......
Page 619: ......
Page 620: ......
Page 621: ......
Page 622: ......
Page 623: ......
Page 624: ......
Page 625: ......
Page 626: ......
Page 627: ......
Page 628: ......
Page 629: ......
Page 630: ......
Page 631: ......
Page 632: ......
Page 633: ......
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......
Page 644: ......
Page 645: ......
Page 646: ......
Page 647: ......
Page 648: ......
Page 649: ......
Page 650: ......
Page 651: ......
Page 652: ......
Page 653: ......
Page 654: ......
Page 655: ......
Page 656: ......
Page 657: ......
Page 658: ......