Commissioning
CX9020
34
Version: 2.0
6.3
Switching on
Please ensure that the Embedded PC is fully configured before switching on the Embedded PC.
Switch on the Embedded PC as follows:
1. Ensure that all extension, system and fieldbus modules are connected correctly.
2. Check whether the right CX2100 power supply unit and the right installation position were selected.
3. Check whether the Embedded PC is mounted securely on the DIN rail and all required Bus Terminals
are connected.
4. Only then switch on the power supply for the power supply unit.
ð
The Embedded PC starts automatically when the external power supply is switched on. The pre-installed
operating system is started and all connected extension, system and fieldbus modules are configured.
6.4
Switching off
Loss of data
If the Embedded PC is switched off during operation, data on the CFast card or other hard disks
may be lost.
Do not disconnect the Embedded PC during operation.
Switch off the Embedded PC as follows:
1. Stop all running programs properly, e.g. the control software on the Embedded PC.
2. Shut down the operating system.
3. Do not switch off the external power supply until all other tasks have been completed, in order to switch
off the Embedded PC.
Summary of Contents for CX9020
Page 1: ...Manual CX9020 Embedded PC 2 0 2019 04 09 Version Date ...
Page 2: ......