J326XP-IM-5AB
3-10
Operation
Entering Run Parameters
1
Install the rotor.
2
Set up sample and buffer reservoirs and tubing lines as described in the rotor manual.
a.
Route the tubing lines through the elutriator port holes at the left side of the door seal.
b.
Close the centrifuge door.
3
Turn the
ROTOR
knob to the
JE
position.
•
5.0 appears in the
ROTOR ID
display.
4
Enter the remaining run parameters. Refer to the JE-5.0 rotor manual for rotor setup and
operating instructions.
•
The run is ready to begin.
5
Press
START
.
•
The rotor accelerates to set speed.
6
When the rotor reaches set speed, turn on the strobe controls by pressing the strobe power
switch.
•
The power switch indicator lights.
1.
Strobe Power Switch
ROTOR
JSP
JS
JA
JLA
JV
JE
JCF
ELUTRIATOR
DELAY
1
Summary of Contents for Avanti J-26 XP Series
Page 6: ...J326XP IM 5AB vi Safety Notice Chemical and Biological Safety ...
Page 12: ...xii Tables ...
Page 16: ...J326XP IM 5AB xvi Introduction Recycling Label ...
Page 40: ...J326XP IM 5AB 2 8 Description Controls and Indicators ...
Page 54: ...J326XP IM 5AB 3 14 Operation Unloading the Centrifuge ...
Page 74: ...J326XP IM 5AB Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 76: ... 2012 Beckman Coulter Inc All Rights Reserved www beckmancoulter com ...