J326XP-IM-5AB
1-15
Specifications and Preinstallation Requirements
Using J2 Series Rotors in the Avanti J
1
The following information pertains to JCF-Z rotors manufactured before March, 1997, and to JCF-Z
rotors that have not been modified at the factory.
•
When the bearings in the JCF-Z rotating seal assembly get old or worn, the resulting “drag” on
the bearings changes the rotor’s dynamic properties, making them similar to those of several
Beckman Coulter fixed angle rotors. If rotor misidentification occurs when your JCF-Z rotor is
used, first perform three runs from 0 to 5000 rpm and back to 0 rpm. If rotor misidentification
recurs, replace the bearings. See the JCF-Z rotor instruction manual (publication JCFZ-IM) for
bearing replacement instructions. Be sure to follow instructions in the next paragraph below
for “wearing in” the bearings.
•
On the first few uses of a new JCF-Z rotor, or when the bearings have been replaced in an older
JCF-Z rotor, lubrication has not yet been thoroughly distributed around the bearings in the
bearing housing. The excess lubrication produces drag on the bearings, which can change the
rotor’s dynamic properties enough to cause rotor misidentification. To “wear in” the bearings
and distribute the lubrication, perform three runs from 0 to 5000 rpm and back to 0 rpm.
NOTE
If the JCF-Z rotor is misidentified, the run speed will be limited to the maximum speed for the identified
rotor. (The maximum speed for the JCF-Z rotor is 20 000 rpm.)
Summary of Contents for Avanti J-26 XP Series
Page 6: ...J326XP IM 5AB vi Safety Notice Chemical and Biological Safety ...
Page 12: ...xii Tables ...
Page 16: ...J326XP IM 5AB xvi Introduction Recycling Label ...
Page 40: ...J326XP IM 5AB 2 8 Description Controls and Indicators ...
Page 54: ...J326XP IM 5AB 3 14 Operation Unloading the Centrifuge ...
Page 74: ...J326XP IM 5AB Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 76: ... 2012 Beckman Coulter Inc All Rights Reserved www beckmancoulter com ...