Table of contents
Table of contents
Operator's obligation to exercise diligence
Additional plug-in cards (optional)
Installation of the PC in the control cabinet
Pin assignment of the connector
Material for assembling the connectors
PC_ON, Power-Status, UPS output
Check voltage rating and connect
Switching the Industrial PC on and off
First switching on and driver installation
Replacing the battery on the motherboard
UPS Software Components (optional)
1
C63xx
Summary of Contents for C63 Series
Page 2: ...S t o c k C h e c k c o m...