31
Burner Manual —
CG10-24
Section: MAINTENANCE AND SERVICE
|
Gas supply piping:
1. Inspect all piping for leakage and
proper installation.
2. Perform necessary repairs to comply with
all codes.
3. Check inlet pressure to the gas valve.
|
Installation area:
1. Insure that there are no combustible materials,
flammable liquids or vapors in the vicinity of the
heating appliance.
2. Verify that the combustion air supply
is adequate.
|
Adjust the burner for proper combustion:
1. Run the burner and perform a complete
combustion test using the proper instruments.
If necessary refer to section titled “Burner
Start-up” on page 24. Record the results
for reference.
2. Visually inspect the flame. Look for changes in
shape, size, and color.
3. Monitor several burner start-up cycles. Verify
prompt ignition and flame stability.
4. Calculate the input firing rate and compare to the
appliance specifications.
5. Monitor the stack temperature. Compare to
start-up and trend level.
|
7590 GeniSys Primary Control:
Follow the
instructions in Beckett GeniSys Model
7590 manual (available at www.beckettcorp.com
or by calling 1-800-645-2876). Verify that the control
is functioning to specifications. See “Check for
Normal Operation” section.
|
Manual shutdown for long periods:
1. Close all gas valves in the gas supply piping
system.
2. Turn off all electrical power to the burner.
3. Protect the burner and controls from moisture
and dirt.
Figure 22 –
Electrode and Flame Rod Setting
Note: Flame Rod crosses centerline of head assembly.
1/8”
Gap
3/8”
Gap
3/8”
Gap
1/8”
Gap
1/4”
(Insulator
Height)
90°
Bottom View
Bottom View
Side View
3/8”
Gap
1/4”
Gap
1/8”
Gap
CG10.1 - 10.3
CG10.4 - 10.6
CG10.1S - 10.6S