- 5 -
III. STEPS OF INSTALLATION
A. Location of installation
Check and insure the installation location (concrete, layout, space size etc.) is suitable for
lift installation.
B. Check the parts before assembly
1. Packaged lift and hydraulic power unit
(See Fig. 6)
.
2. Open the outer packing carefully
(See Fig. 7)
.
Shipment Parts List
3. Take off the Drive-in Ramps and Columns
(See Fig. 8)
.
4. Loose the screws of the upper package stand, take off the offside platform, take out the
parts inside the power-side platform, then remove the package stand.
Fig. 6
Power-side Platform
Drive-in Ramp
Offside Platform
Cross Beam
Column
Fig. 7
Parts box
Fig. 8
Summary of Contents for 30-41200A
Page 1: ...4 post Lift Model 30 41204 30 41200A 30 41200AE...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model 41204 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...