- 15 -
2. The cable pass through the cross beam to top plate of columns and be screwed with cable
nuts
(See Fig. 27, 28),
then install the cable limit pin.
(See Fig. 29)
7
Cable pass through
between the big pulley
and tension pulley
D View
Fig.27
Cable pass through top
plate and be screwed
with cable nuts.
E View
Fig.28
F View
Fig. 29
Install limit pin
Cable
60B
Pulley
60A
Cable Limit pin
E
D
F
After installation
Summary of Contents for 30-41200A
Page 1: ...4 post Lift Model 30 41204 30 41200A 30 41200AE...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model 41204 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...