- 10 -
E. Fix the anchor bolts
1. Prepare the anchor bolts
(See Fig. 16).
2. Using the prescribed rotary hammer drill, and drill all the anchor holes and install the
anchor bolts, do not tighten the anchor bolts first
(See Fig. 17).
F. Install the safety ladders
1. Take off the pulley safety cover and unscrew the four upper nuts of the Safety Ladders, and
then adjust the four lower nuts to be at the same position. Withdraw the Slack-cable safety
lock of the Cross-beam to insert the Safety Ladder in, raise the Safety Ladder, and screw the
upper nuts
(See Fig. 18
.
)
Fig. 18
6
Nut
Spring washer
Washer
Fig. 16
Drilling
Clearing
Expand
5
Fig. 17
Safety Ladder is
inserted between
Limit Pins
Limit Pin
Limit Pin
Safety Ladder
Safety Ladder is
inserted between Limit Pins
11
5m
m
Note: Minimum embedment of anchors is 115mm.
Summary of Contents for 30-41200A
Page 1: ...4 post Lift Model 30 41204 30 41200A 30 41200AE...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model 41204 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...