5.5

 

Mains Connection 

 

Each Beacon Master/Repeater Station requires a 3A spur, returning to a breaker clearly marked “

EVCS 

DO NOT TURN OFF”

.   

 

If the Beacon Master Station and the Beacon Repeater Station are distributed around a site, it is 

essential that both Beacon Stations are on the same mains phase, as they are classified TEN 230V.  

Powering from different phases can mean a 440V potential can be present in a Beacon Station during 

a major fault incident. 

 

5.6

 

Battery Information 

In the event of mains failure BS5839 Part 9:2021 requires battery backup for 24 hours standby and 3 

hours operation thereafter. 

 

A Beacon

 

Master/Repeater Station requires 

one number

 12V 7AH vent regulated sealed lead acid 

battery.  The battery is not supplied with the Beacon  Master/Repeater Station. 

 

 

 

Safety Information: 

Sealed Lead Acid batteries contain sulphuric acid which can cause burns if exposed to 

the skin.  The low internal resistance of these batteries mean large currents will flow if 

they are accidentally short-circuited causing burns and a risk of fire.   

Exercise caution when handling batteries.  

 

Power Up Procedure: 

Always apply mains power before connecting batteries.  When connecting batteries, 

always connect the Positive (Red +) terminal first.  

 

Power Down Procedure 

Disconnect the batteries before removing the mains power.  When disconnecting 

batteries, always remove the Negative (Black –) terminal first.

 

5.7

 

Outstation Connections 

The Beacon Master Station is equipped with at least one number Dual line card. One outstation per 

line output can be connected. If no outstation is connected to the line output, then an end of line 10k

 

resistor should be fitted. The dipswitch located on the rear of the door mounted Display PCB is used for 

configuration see 6.1 

 

The following devices are available on the system:  

 

Type A (fixed phone) 

 

Type B (hands-free refuge point) 

 

Type C “Combi” (combined Type A and Type B)  

 

Jack point 

 

“Assist Call” emergency assistance alarm system 

 

For Type A, Type B, and Type C outstations, the end-of-line 10k

 resistor should be removed from the 

accessory pack and connected to the end-of-line terminal in the outstation.   

 

For Jack points and the “Assist Call” system, the end-of-line 10k

 resistor should also be removed from 

the accessory pack and connected to the last plate on the system. 

 

>3mm

3A

Main

Distribution

Board

>0.75mm

2

 <2.5mm

2

UNITY

DAU

Beacon  

Master Station 

Summary of Contents for BM2

Page 1: ...Installation and Commissioning Manual Beacon BM2 4 8 Master Station...

Page 2: ...ocedure 12 5 10 Powering down procedure 12 6 Set up procedure 13 6 1 Beacon Master Station Display PCB Dipswitch Settings 13 6 2 Adding a Line Card 14 6 3 Removing a Line card 14 6 4 Adding a Beacon R...

Page 3: ...Telephones and Disabled Refuge Points are required 1 2 Suitability Fire telephone systems are recommended for all public buildings and multi story buildings over four floors by BS9999 Disabled Refuge...

Page 4: ...g to a breaker clearly marked EVCS DO NOT TURN OFF If the Beacon Master Station and the Beacon Repeater Station are distributed around a site it is essential that both Beacon Stations are on the same...

Page 5: ...1 number 2 5mm AF Hex Key o 1 number door handle key o End of Line EoL Resistors 2 per line card Use the 2 5mm AF Hex Key supplied to open the right hand front cover Verify the following items are pre...

Page 6: ...slotted entries with a dedicated mains supply entry at the rear If a knockout is removed by mistake fill the hole with a good quality cable gland Unused knockouts must be left unopened to comply with...

Page 7: ...ge EVC System For buildings less than 30m in height or any building with sprinklers fitted standard grade fire resistant cable may be used to wire Type B outstation and the mains supply to the Master...

Page 8: ...Page 8 of 24 5 4 1 Beacon Master Station The wiring for a Beacon Master Station is shown in the schematic below...

Page 9: ...stem has to be wired as a ring with each outstation connected via a radial circuit to either the Master Station or Repeater Station as shown in the schematic below This ensures that the any single cab...

Page 10: ...g batteries Power Up Procedure Always apply mains power before connecting batteries When connecting batteries always connect the Positive Red terminal first Power Down Procedure Disconnect the batteri...

Page 11: ...terminal block in the controller and the earth connection in the metal back box if a plastic back box is used cut the earth back and insulate at the outstation 5 7 3 ACA Accessible Toilet Kit The BAKI...

Page 12: ...Type B outstations automatically time out after approximately 30 minutes It is advised that this feature is not used as the system should always be available not just during an evacuation If the feat...

Page 13: ...B 6 1 BM2 4 8 Master Station Display PCB Dipswitch Settings 1 2 3 4 5 6 7 8 Line 1 2 Line 3 4 Line 5 6 Line 7 8 Net In Net Out Network Reserved Remarks Line card 1 fitted Line card 1 2 fitted Line car...

Page 14: ...ne Card from Exchange PCB 4 Set the dipswitch on the Display PCB see 6 1 to disable Line Card monitoring Once the Line Card has been removed the Beacon Master Station may be powered see 5 9 6 4 Adding...

Page 15: ...0 1 4 0 0 1 0 0 0 36 0 0 1 0 0 1 5 1 0 1 0 0 0 37 1 0 1 0 0 1 6 0 1 1 0 0 0 38 0 1 1 0 0 1 7 1 1 1 0 0 0 39 1 1 1 0 0 1 8 0 0 0 1 0 0 40 0 0 0 1 0 1 9 1 0 0 1 0 0 41 1 0 0 1 0 1 10 0 1 0 1 0 0 42 0 1...

Page 16: ...In not configured Green Solid Net In healthy Yellow Flashing Net In fault 6 Blank Net Out not configured Green Solid Net Out healthy Yellow Flashing Net Out fault 7 Green Solid Display Processor Heal...

Page 17: ...is fitted and tested Line 3 Red Blue to indicate a type B outstation and an Assist Call system are fitted and tested Line 4 Solid Magenta to indicate that no outstation has been tested Press zone butt...

Page 18: ...line is now connected and a conversation can take place 8 2 Making a call To make a call lift the Master handset receiver and the User LED will illuminate red Press the zone button for the required ou...

Page 19: ...during the acknowledge phase indicates to the WC user that help is on the way 8 7 Accepting Faults Before accepting faults the fault must be noted in the log book along with the time the fault was re...

Page 20: ...d Flashing Red Green Call on hold Solid Yellow Master handset short circuit Solid White Call connected on remote master station 9 4 Zone indicator summary Zone Indicator Status User Indicator Status B...

Page 21: ...tify feature has been included Select line identify mode and visit each outstation and listen for the corresponding number of rings This should correspond with the line number i e 2 rings would be lin...

Page 22: ...ated in the centre above the display PCB the outstation zone template can be inserted here The template is in Word format and can be down loaded at www espuk com This can be completed printed out and...

Page 23: ...Page 23 of 24 Notes...

Page 24: ...In use volt free 30Vdc 1A Controls Number and type 8 push button zone keys Indication Number and type 8x RGB Line indicators 3x PSU Status Indicators 1 x CPU Fault Indicators 1x General Fault Indicat...

Reviews: