Preventive Maintenance
11
SIGMA Spectrum Infusion System
Pump Operating Software Version 6.02 and 6.05
Preventive Maintenance
For Use With MDL Version 6
1. Attach the pole clamp to a stable IV pole.
2. Obtain a new compatible IV set.
3. Connect the set to the IV container.
4. Verify that the IV bag contains enough fluid to complete the testing.
5. Verify the drip chamber is at fill line.
6. Verify that there is no foreign material in the delivery solution during flow rate testing.
7. Prime the IV set, removing all air from the tubing.
NOTE:
Follow the instructions on the IV bag to fill drip chamber.
8. Plug the AC Power Adaptor into a working wall outlet, or install a Battery Module
9. Insert the slide clamp into the keyhole and open the Pump door. Verify that the Pump powers
on.
1
The drip chamber filled to fill line.
2
610 ± 51 mm (24 in ± 2 in) between the top
of the fluid level and the center of the
Pump.
3
Do not allow the tip of the IV set to fall
below the fluid level of the collection cup or
graduated cylinder during the test.
4
The maximum vertical distance of 304.8
mm (12 in) from the center of the pump to
the distal end of the IV set
Figure 1. Test Setup.
2
3
4
1