82
instructions pertaining to the instaLLer
924.493.3
it
at
gB
11. boiler size
Figure 6
0310_0103
12. installation of flue and air ducts
We guarantee ease and flexibility of installation for a gas-fired forced draft boiler thanks to the fittings and fixtures supplied
(described below).
The boiler is especially designed for connection to an exhaust flue / air ducting, with either coaxial, vertical or horizontal
terminal. By means of a splitting kit a two-pipe system may also be installed.
in case exhaust and intake flues not supplied by BaXi s.p.a. have been installed, these must be certified for the
type of use and must have a maximum pressure drop of 100 pa.
Warnings for the following types of installation:
c
13
, c
33
The terminals for the split flue must be provided for within a square with 50 cm sides. Detailed instructions are
given together with each accessory.
c
53
The terminals for combustion air intake and for the expulsion of combustion products must not be provided for
on opposite walls of the building.
c
63
The maximum pressure drop of the ducts must not exceed 100 Pa. The ducts must be certified for the specific
use and for a temperature of over 100°C. The chimney flue must be certified in accordance with the prEN 1856-1
Regulation.
c
43
, c
83
The chimney or flue used must be suitable for the use.
0310_0104
Figure 7
Summary of Contents for LUNA HT 1.350
Page 35: ......
Page 69: ......
Page 103: ...103 instructions pertaining to the installer 924 493 3 IT AT GB...