2.3 Specific Safety Instructions
2.3.1 Handling
3 Technical Specifications
3.1 Technical Data
3.2 Technical Parameters
3.2 Dimensions and Connections
3.3 Electrical Diagram
4 Description of the Product
4.1 General Description
4.2 Operating Principle
4.3 Main Components
4.4 Control Panel Description
4.4.1 User Interaction Controller
4.5 Standard Delivery
4.6 Accessories & Options
4.6.1 Optional Extras
5 Before Installation
5.1 Installation Regulations
5.2 Installation Requirements
5.2.1 Gas Supply
5.2.2 Electrical Supply
5.2.3 Hard Water Areas
5.2.4 Bypass
5.2.5 System Control
5.2.6 Treatment of Water Circulating Systems
5.2.7 System Details - General
5.2.8 Low Head Installation / Open
5.2.9 Sealed Systems Details
5.3 Choice of the Location
5.3.1 Location of the Appliance
5.3.2 Data Plate
5.3.3 Bath & Shower Rooms
5.3.4 Ventilation
5.3.5 Condensate Drain
5.3.6 Clearances - Access in Service
5.3.7 Flue / Chimney Location
5.3.8 Horizontal Flue / Chimney Systems
5.3.9 Flue/Chimney Trim
5.3.10 Terminal Guard
5.3.11 Flue/Chimney Deflector
5.3.12 Flue/Chimney Accessories
5.3.13 In Case Rear Flue
5.4 Unpacking & Initial Preparation
5.4.1 Unpacking
5.4.2 Initial Preparation
5.4.3 Making the Water Connection
5.4.4 Filling the Condensate Trap
5.4.5 Connecting the Condensate Drain
5.4.6 Connecting the Gas Supply
6 Installation
6.1 Air Supply / Flue Gas Connections
6.1.1 Connecting the Top Flue
6.1.2 Connecting the 'In Case' Rear Flue
6.2 Electrical Connections
6.2.1 Electrical Connections of the Appliance
6.2.2 Connecting External Devices
6.3 Filling the System
6.4 Completing the Installation
6.4.1 Completion
7 Commissioning
7.1 General
7.2 Checklist before Commissioning
7.2.1 Preliminary Electrical Checks
7.2.2 Checks
7.3 Commissioning Procedure
7.4 Gas Settings
7.4.1 'Chimney Sweep' Mode
7.4.2 'Chimney Sweep' Mode - Combustion Check
7.5 Configuring the System
Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual
http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...
4 of 55
23/01/2018, 11:44