![Baxi EcoBlue Advance 16 Heat ErP Installation And Service Manual Download Page 11](http://html1.mh-extra.com/html/baxi/ecoblue-advance-16-heat-erp/ecoblue-advance-16-heat-erp_installation-and-service-manual_2711776011.webp)
DIMENSIONS
A 625mm
A2 25mm
B 270mm
C 370mm
D 116mm Ø Min.
E 165mm
F 155mm
G 110mm
H 550mm
For clearances see
Section 5.3.6
NOTE: There must be no part of the air duct (white tube) visible outside the property after installation.
The flue seal should fit neatly and effect a good seal.
IMPORTANT: The 1.5° fall provided by the elbow is to allow condensate to r un back to the boiler, for
disposal through the condensate discharge pipe.
When using extensions the fall along the flue system must be increased to 3°.
Where extensions are used ensure the clearance above the top of the flue elbow (X) is as shown in the
table below:-
Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual
http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...
11 of 55
23/01/2018, 11:44