![Baxi EcoBlue Advance 16 Heat ErP Installation And Service Manual Download Page 2](http://html1.mh-extra.com/html/baxi/ecoblue-advance-16-heat-erp/ecoblue-advance-16-heat-erp_installation-and-service-manual_2711776002.webp)
Building Regulations and the Benchmark Commissioning Checklist
Building Regulations (England & Wales) require notification of the installation of a heating appliance to the relevant Local Authority Building Control Department.
This can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the Local Authority directly.
The Health & Safety Executive operates the "Gas Safe Register", a self certification scheme for gas heating appliances.
This company is a member of the Benchmark initiative and fully supports the aims of the programme. Its aim is to improve the standards of installation and commissioning of
central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency.
Building Regulations require that installations should comply with manufacturer's instructions. It is therefore important that the commissioning checklist is completed by the
installer. The relevant section of Building Regulations only relates to dwellings. Therefore the checklist only applies if the appliance is being installed in a dwelling or some related
structure.
The flowchart
below
gives guidance for installers on the process necessary to ensure compliance with Building Regulations.
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the manufacturers instructions by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and
Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for more information.
© Baxi Heating UK Ltd 2015 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, or stored in any retrieval system of any
nature (including in any database), in each case whether electronic, mechanical, recording or otherwise, without the prior written permission of the copyright owner, except for
permitted fair dealing under Copyrights, Designs and Patents Act 1988.
Applications for the copyright owners permission to reproduce or make other use of any part of this publication should be made, giving details of the proposed use, to the following
address:
The Company Secretary, Baxi Heating UK Limited, Brooks House, Coventry Road, Warwick. CV34 4LL
Full acknowledgement of author and source must be given.
WARNING: Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages.
You have just purchased one of our appliances and we thank you for the trust you have placed in our products. Please note that the product will provide good service for a longer
period of time if it is regularly checked and maintained. Our customer support network is at your disposal at all times.
page 2
Installer Notification Guidelines
Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual
http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...
2 of 55
23/01/2018, 11:44