5.3.7 Flue/Chimney Location

The following guidelines indicate the general requirements for siting balanced flue terminals.
For GB recommendations are given in BS 5440 Pt 1.
For IE recommendations are given in the current edition of I.S. 813 "Domestic Gas Installations".

1. 

Under car ports we recommend the use of the plume displacement kit.

The terminal position must ensure the safe and nuisance - free dispersal of combustion products.

Fig. 11

Terminal Position with Minimum Distance (

Fig. 11

)

(mm)

A

1

Directly below an opening, air brick, opening windows, etc.

300

B

1

Above an opening, air brick, opening window etc.

300

C

1

Horizontally to an opening, air brick, opening window etc.

300

D

2

Below gutters, soil pipes or drain pipes.

25 (75)

E2 Below eaves.

25 (200)

F

2

Below balconies or car port roof.

25 (200)

G

2

From a vertical drain pipe or soil pipe.

25 (150)

H

2

From an internal or external corner.

25 (300)

I

Above ground, roof or balcony level.

300

J

From a surface or boundary line facing a terminal.

600

K

From a terminal facing a terminal (Horizontal flue).

1200

From a terminal facing a terminal (Vertical flue).

600

L

From an opening in carport (e.g. door, window) into the dwelling.

1200

M

Vertically from a terminal on the same wall.

1500

N

Horizontally from a terminal on the same wall.

300

R

From adjacent wall to flue (vertical only).

300

S

From an adjacent opening window (vertical only).

1000

T

Adjacent to windows or openings on pitched and flat roofs

600

U

Below windows or openings on pitched roofs

2000

1

In addition, the terminal should be no nearer than 150 mm to an opening in the building fabric formed for the purpose of accommodating a built-in element such as a window

frame.

2

Only ONE 25mm clearance is allowed per installation. If one of the dimensions D, E, F, G or H is 25mm then the remainder MUST be as shown in brackets, in accordance with

B.S.5440-1.

page 30

Due to the nature of the boiler a plume of water vapour will be discharged from the flue.
This should be taken into account when siting the flue terminal.

If the terminal discharges onto a pathway or passageway, check that combustion products will not cause a nuisance and that the terminal will not obstruct the passageway.

2. 

If a terminal is less than 2 metres above a balcony, above ground or above a flat roof to which people have access, then a suitable terminal guard must be provided.

3. 

The distance from a fanned draught appliance terminal installed parallel to a boundary may not be less than 300mm in accordance with the diagram opposite (

Fig. 12

).

4. 

Reduction to the boundary is possible down to 25mm but flue deflector part no. 5111068 or the appropriate Plume Displacement Kit must be used.
The nuisance factor must still be taken into account when these options are being considered.

Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual

http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...

24 of 55

23/01/2018, 11:44

Summary of Contents for EcoBlue Advance 16 Heat ErP

Page 1: ...in conjunction with the Flue Installation Guide page 1 Model Range Baxi EcoBlue Advance 13 Heat ErP G C No 41 470 34 Baxi EcoBlue Advance 16 Heat ErP G C No 41 470 35 Baxi EcoBlue Advance 19 Heat ErP...

Page 2: ...gulations The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out insta...

Page 3: ...Manufacturers Liability 1 5 2 Installers Liability 1 6 Homologations 1 6 1 Certifications 1 6 2 Directives 1 6 3 Standards 2 Safety 2 1 General Safety Instructions 2 2 Recommendations Baxi EcoBlue Adv...

Page 4: ...imney Location 5 3 8 Horizontal Flue Chimney Systems 5 3 9 Flue Chimney Trim 5 3 10 Terminal Guard 5 3 11 Flue Chimney Deflector 5 3 12 Flue Chimney Accessories 5 3 13 In Case Rear Flue 5 4 Unpacking...

Page 5: ...aving the appliance behind you should ensure that the manual is kept with the appliance for consultation by the new owner and their installer Read the instructions fully before installing or using the...

Page 6: ...he appliance Failure to abide by the instructions on installing the appliance This company declares that no substances harmful to health are contained in the appliance or used during appliance manufac...

Page 7: ...fficiency requirements for new hot water boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0063 Product Production certified by Notified Body...

Page 8: ...eel physically able Wear appropriate Personal Protection Equipment e g protective gloves safety footwear etc Preparation Co ordinate movements know where and when you are both going Minimise the numbe...

Page 9: ...35mm Min Below Casing in Cupboard 35mm Min Below Casing 120 mm Min Front For Servicing 800mm Min Front In Operation 5mm Min See Section 5 3 6 for full details Weights Packaged Boiler Carton 21 5 kg In...

Page 10: ...efficiency ns 93 93 93 93 93 Useful efficiency at rated heat output and high temperature regime 2 n4 88 0 87 9 87 8 87 7 87 5 Useful efficiency at 30 of rated heat output and low temperature regime 1...

Page 11: ...NT The 1 5 fall provided by the elbow is to allow condensate to r un back to the boiler for disposal through the condensate discharge pipe When using extensions the fall along the flue system must be...

Page 12: ...ll other wires are black page 17 4 Description of the Product 4 1 General Description The Baxi EcoBlue Advance Heat Range are gas fired wall mounted powered flue condensing boilers 1 The maximum outpu...

Page 13: ...a label is positioned on the inside lower right hand side of the boiler and can be seen when the outercase panel is removed Fig 1 7 Fig 1 The boiler is intended to be installed in residential domestic...

Page 14: ...by varying the fan speed and thereby the gas rate to achieve the optimum boiler operation If the boiler flow temperature exceeds the boiler set point the burner will turn off Fan and Gas Valve off 4...

Page 15: ...User Interaction Controller has 2 illuminating push buttons which provide information about the operating condition of the boiler 1 The RESET button lights up green when the boiler has a demand for C...

Page 16: ...ve Gas safety regulations Water supply regulations 5 2 Installation Requirements 5 2 1 Gas Supply The gas installation should be in accordance with the relevant standards In GB this is BS 6891 NG In I...

Page 17: ...r Drain cocks should be fitted to all system low points All gas and water pipes and electrical wiring must be installed in a way which would not restrict the servicing of the boiler Position isolating...

Page 18: ...head See Table 1a 3 FILLING POINT A filling point connection on the central heating return pipework must be provided to facilitate initial filling and pressurising and also any subsequent water loss...

Page 19: ...mmended to incorporate an appropriate device for frost protection in the system controls 2 If the boiler is fitted in a room containing a bath or shower it MUST NOT BE fitted in zone 0 or 1 ONLY withi...

Page 20: ...sible discharge into an outside drain is permissible providing every possible precaution is taken to prevent freezing 1 Ensure the discharge of condensate complies with any national or local regulatio...

Page 21: ...connect upstream of the sink or other waste water receptacle page 27 Baxi EcoBlue Advance 13 16 19 25 30 Heat ErP Installation Manual http interpart partsarena eu System DATA Dx DS1 installation S219...

Page 22: ...ble MULTIFIT part no 720648301 This pump will dispose of both condensate high temperature water from the relief valve It has a maximum head of 5 metres Follow the instructions supplied with the pump 1...

Page 23: ...ent Figs 9 10 Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler 2 These are MINIMUM recommended d...

Page 24: ...tical only 1000 T Adjacent to windows or openings on pitched and flat roofs 600 U Below windows or openings on pitched roofs 2000 1 In addition the terminal should be no nearer than 150 mm to an openi...

Page 25: ...e Horizontal Concentric equivalent flue lengths are 60 100 80 125 6 metres 12 metres 3 Any additional in line bends in the flue system must be taken into consideration Their equivalent lengths are 135...

Page 26: ...ue trims supplied can be fitted on the outer and inner faces of the wall of installation Fig 14 1 Baxi EcoBlue Advance 13 16 19 25 30 Heat ErP Installation Manual http interpart partsarena eu System D...

Page 27: ...xtensions clamps etc refer to the Flue Accessories Fitting Guide supplied in the literature pack 5 3 13 In Case Rear Flue For more detail on in case rear flue Fig 17 see Section 6 1 2 This flue accomm...

Page 28: ...Fig 21 6 For top flue installation the flue can be fitted after the boiler has been fitted to the wall bracket see Section 6 1 7 Fig 21 If the boiler is being fitted in a cupboard or other place wher...

Page 29: ...e trap Remove and discard the sealing cap 3 Fill the condensate trap with tap water to a depth of approximately 75mm 4 Carefully relocate the condensate trap in the boiler ensuring all seals are locat...

Page 30: ...ensure a fall back to the boiler Measure the distance from the outside wall face to the elbow This dimension will be known as X Fig 25 4 If the distance from the flue elbow to the outside face of the...

Page 31: ...ssary to lubricate to ease assembly of the elbow and flue Fig 30 12 Ensure that the terminal is positioned with the slots to the bottom Fig 31 Secure the flue to the elbow with the screws supplied Fig...

Page 32: ...l construction and fire rating 14 If necessary fit a terminal guard see Section 5 3 11 15 Fig 28 Fig 29 Fig 30 Fig 31 page 37 Baxi EcoBlue Advance 13 16 19 25 30 Heat ErP Installation Manual http inte...

Page 33: ...e flue 3 Measure the wall thickness This dimension will be known as A 4 Insert the telescopic flue into the wall bracket and secure with the three screws Fig 34 5 Measuring from the wall bracket to th...

Page 34: ...ake good with sealant or cement 12 Ensure that the terminal is positioned with the slots to the bottom Fig 31 Secure the flue to the elbow with the screws supplied Fig 30 13 It is essential that the f...

Page 35: ...t live in the existing supply it can be connected to spare terminals 2 or 3 of the plug supplied 1 To comply with Part L1 of the Building Regulations the heating system into which the boiler is instal...

Page 36: ...e system Section 5 2 7 for open vent system details Section 5 2 9 for sealed system details and Section 5 4 4 for filling the condensate trap 6 4 Completing the Installation 6 4 1 Completion Baxi EcoB...

Page 37: ...ls Check the integrity of the boiler combustion circuit and the relevant seals Check the integrity of all gas and water joints 7 3 Commissioning Procedure CAUTION On first firing the boiler an odour m...

Page 38: ...te condition check that the operational working gas pressure at the inlet gas pressure test point is in accordance with B S 6798 B S 6891 This must be AT LEAST 17mb Fig 41 2 Ensure that this inlet pre...

Page 39: ...lar servicing 3 For IE it is necessary to complete a Declaration of Conformity to indicate compliance with I S 813 An example of this is given in I S 813 Domestic Gas Installations This is in addition...

Page 40: ...switched off or the gas supply to be turned off then any frost protection present will be inactive 1 Switching off the boilers power supply or turning off the gas supply will disable any frost protec...

Page 41: ...g point Fig 42 insert the analyser probe and obtain the CO CO2 ratio This must be less than 0 004 If the combustion reading CO CO2 ratio is greater than this and the integrity of the complete flue sys...

Page 42: ...flue pipes and air supply pipes for leaks b Check and clean if necessary the condensate trap c Check the ignition electrode replace if necessary d Check the combustion e Complete the relevant Service...

Page 43: ...sket 3 Fit the new electrode and if necessary replace the gasket Connect the electrode lead to the PCB and earth wire to the new electrode 4 Fig 46 10 3 2 Automatic Air Vent Fig 47 Remove the clip sec...

Page 44: ...duct pull the duct forwards and then manoeuvre it out of the heat exchanger sump connection 2 10 3 5 Pressure Switch 25 30 only Fig 50 Disconnect the pressure switch wiring from the overheat sensor wi...

Page 45: ...wiring 3 10 3 7 Overheat Sensor Fig 51 The sensor is fitted in a dry pocket For ease of access remove the Flow Temperature Sensor 10 3 6 Disconnect the wiring from the overheat sensor 1 Unscrew the s...

Page 46: ...and slide it upwards to remove 1 Disconnect the wiring from the parameter unit 2 Fit the new parameter unit and reconnect the wiring 3 Fig 53 page 54 10 3 10 Gas Valve Figs 54 55 56 After replacing t...

Page 47: ...pply pipe 6 Lift the gas valve from its seat and pull it gently downwards to release it from the fan assembly 7 Remove the 2 O Rings from the gas feed pipe and replace with new ones supplied in the ki...

Page 48: ...undo the nut on the gas inlet pipe at the base of the valve 4 Remove the gas assembly from the boiler by releasing the over centre catches that secure it to the heat exchanger 5 Remove the screws secu...

Page 49: ...ns clockwise If the boiler will not light or the correct CO2 cannot be achieved contact the heateam technical helpline The maximum rate CO2 setting can only be reached via the minimum rate Press the C...

Page 50: ...and number of flashes displayed is dependent on the boiler status or fault condition The orange LEDs will flash at EVERY heating demand The number of flashes will correspond with the output of the boi...

Page 51: ...rature thermostat fault or bad connection open circuit PCB over temperature condition Flue fault resulting in recirculation or activation of air pressure switch if fitted Check connections to and oper...

Page 52: ...cklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer t...

Page 53: ...is completed Service Provider Before completing the appropriate Service Record below please ensure you have carried out the service as described in the manufacturers instructions Baxi EcoBlue Advance...

Page 54: ...k Holidays 8 30am 2 00pm Please note calls may be recorded for training and monitoring purposes baxi co uk Register now to activate your warranty Baxi EcoBlue Advance 13 16 19 25 30 Heat ErP Installat...

Page 55: ...accordance with these installation instructions and that you adhere to the Building Regulations All descriptions and illustrations provided in this document have been carefully prepared but we reserv...

Reviews: