![Baxi Bioflo Installation & Servicing Instructions Manual Download Page 34](http://html.mh-extra.com/html/baxi/bioflo/bioflo_installation-and-servicing-instructions-manual_2711687034.webp)
33
For the Electrician
3.1
Electrical connections
The pellet flue-connected boiler and related accessories are designed to be installed only in dry areas (protec-
tion type IP 10).
Installation of electrical components may only be performed by a qualified technician. The regulations and spec-
ifications of ÖVE, VDI, SEV and local ordinances must be followed.
– The mains connection must be protected against short circuit with a 13 A delayed-action fuse.
– On site, the technician must install an all-pole disconnection with at least 3 mm contact gap at the mains access
point. Current-operated r.c.d. protection switches are considered all-pole disconnections (ÖVE regulation).
Be sure to note the separate wiring of the extra-low voltage line (sensor) and low-voltage line
(230 VAC)!
The boiler is pre-wired and internally fused with a T 6.3 A fine-wire fuse to protect against short circuit. If
an MES
module
is ordered (including boiler sensor), this will be installed
in FireWIN
and electrically wired at the factory. When
there are
several MES modules
, they are
all installed in the wall-mount casing
to facilitate operation:
Maximum MES module switching capacity:
Relay outputs: 230 VAC, 6 A (2 A inductive), 50 Hz
WVF and solar modules with X1/X2 contact:
Solid-state relay: 230 VAC, 1 A
The electrical power consumed depends on whether a fully automated pellet feed (suction turbine) is connect-
ed, and on the number of actuators supplied (pumps, mixing valves, etc.).
In areas with increased power surge risk (e.g., lightning strikes in regions prone to storms), we recommend
installation of an appropriate surge protector.
1
2
3
230 VAC
8 x 1 mm
2
5 x 2,5 mm
2
4 x 1,5 mm
2
min. 3 x 0,5 mm
2
Electrical connection of the FireWIN pellet flue-connected
boiler:
with fine-wire PVC sheathed cables, e.g. H05VV-F (YMM-J)
Fig. 44
Electrical connections of the suction turbine:
Note: Each cable
must be routed
separately
together with
the deliv-
ery and return air hose. The cables can be routed together with the
hoses through the fire protection collars to the suction turbine or to
the changeover unit.
Connection of FireWIN pellet flue-connected boiler to the suction tur-
bine:
Two separate cables (
5 and 8-core)
are required
–
this is a requirement of the guarantee conditions!
The cable cross-section must be selected according to the length
of the electric cables so that
the suction turbine
always has a
sta-
ble voltage supply (min. 220 VAC under load)
.
Recommended accessory:
Ribbon cable
5 x 2.5 mm
2
and 8 x 1 mm
2
(FIRE 042 or FIRE 043).
Note: The 8-core cable must be connected in the suction turbine,
because this also carries the LON bus and is required for service
work.
Connection of suction turbine to the changeover unit:
Two separate cables
(3 and 4-core)
are required
–
this is a requirement of the guarantee conditions!
Cable for limit switch (extra-low voltage):
min. 3 x 0.5 mm
2
(not
earthed)
Cable for changeover unit motor (low voltage):
4 x 1.5 mm
2
1
FireWIN pellet flue-
connected boiler
2
Suction turbine
3
Changeover unit