CAUTION:  ISOLATE THE ELECTRICAL SUPPLY
INCLUDING THE PERMANENT LIVE. TURN OFF THE
GAS SUPPLY, ENSURE THAT THE FIRE IS COLD,
TEST FOR GAS SOUNDNESS UPON RE-ASSEMBLY.

Please read the Important Information Section on page 3.
Instructions 1-17 are for servicing to be carried out annually and
should be followed in conjunction with the separate instructions
for the boiler section.

1.

Remove the controls cover panel under the front of the fire
by grasping it firmly by its edges and pulling forwards.

2.

Disconnect the 3 pin plug from the socket under the fire.

3.

Remove the outercase as follows:
(i)

Pull off the control tap knob.

(ii)

Remove the 2 outercase securing screws (Fig.6).

(iii)

Remove the case by easing the lower edge forward
and then lifting upward.

4.

Turn off the gas service tap by turning fully clockwise
(Fig.4).

5.

Disconnect the fire supply pipe from the fire inlet and
remove the 2 screws securing the backing plate to the
inner case. Pull the fire forward until the fire spigot is clear
of the boiler canopy and lift away.

6.

Remove the glass front panel as follows: (Fig.11).
(i)

Ensure that the glass front panel is cold.

(ii)

Disengage the front panel retaining clamps and
remove the glass front panel.

7.

Remove the coal bed by carefully lifting it away from the
locating pins (Fig.11).

CAUTION:  The coal bed is extremely fragile and must be
handled accordingly. Gloves should be worn and any
inhalation of the dust should be avoided. Keep the coals
away from children at all times.

8.

Remove the burner as follows: (Figs.10 and 11).
(i)

Disconnect the compression nuts from the injectors.

(ii)

Remove the 2 screws securing the burner, and
remove the burner out over the support bar.

(iii)

Using a soft brush remove all deposits from the top
of the burner and the burner ports.

9.

Remove and clean or replace the injectors as necessary.
Do not use a pin or wire for cleaning purposes.

10.

Clean any lint or debris from the pilot aeration hole.
Inspect the pilot, thermocouple and electrode assembly for
deterioration and replace if necessary. No adjustment of
the A.S.D. pilot assembly is possible. The A.S.D. should
not be altered to prevent it operating correctly or bypassed
in any way. If the A.S.D. has to be replaced only use a
Genuine Baxi Spare Part.

11.

Replace the parts in reverse order of dismantling, make
sure that:
(i)

The spark gap is as in Fig. 7.

(ii)

The coal bed is correctly fitted over its locating pins.

(iii)

The glass front panel sealing rope is replaced if it is
in anyway damaged.

(iv)

The glass front panel is replaced if it is in anyway
damaged or cracked.

NOTE:  THIS IS A HEAT RESISTANT GLASS AND MUST
NOT BE REPLACED BY ORDINARY GLASS

12.

After servicing the boiler, fit the fire to the boiler and refit
the screws securing the fire backing plate to the inner
case. Connect the fire supply pipe to the inlet adapter.

13.

Turn the service tap ON by turning fully anti-clockwise.
(Gas to boiler and fire). Check for gas soundness.

14.

Temporarily fit the control knob and light the fire. Check
that the gas pressure is correct. (See Commissioning the
Fire.)

15.

Test for clearance of flue products as follows: See
paragraph 9 (Commissioning the Fire).

16.

Refit the outercase, control knob, 3 pin plug, case securing
screws and controls cover plate.

17.

Re-check that the ignition is satisfactory.

Summary of Contents for Bermuda SL3

Page 1: ...Supplied By www heating spares co Tel 0161 620 6677 Baxi Bermuda SL3 Fireside Gas Central Heating Unit Comp No 237883 Issue 4 1 00 Installation and Servicing Instructions ...

Page 2: ...e G C No 37 075 02A fire is controlled by a knob positioned on the right hand side For use with the following boilers of the case Ignition is by piezo spark to the pilot Fig 13 Bermuda 401 Bermuda 45 4 M For details of Propane appliances see back page G C No 44 077 49 G C No 44 077 71 Bermuda 552 Bermuda 45 4 E The control knob has six positions giving a choice of four G C No 44 077 50 G C No 44 0...

Page 3: ...e opening and at the same level as the base of the builders opening The top surface of the hearth should be a minimum of 50mm 2 in above floor level and must be level with the base of the opening On no account should the fire unit be fitted directly onto a combustible floor or carpet Surround or Wall Finish Figs 1 and 2 The wall behind the fire must be non combustible The surround or wall finish m...

Page 4: ...earth or floor 4 It is necessary to unscrew and remove the extension plate from the boiler controls heat shield Once removed this item can be discarded Fig 4 Fitting the Fire HEARTH FIXING 1 Fit the fire backing plate to the fire using the M5 x 8mm thread forming screws provided Fig 5 2 Locate the fire spigot into the draught diverter on the boiler Push the fire backwards until the backing plate t...

Page 5: ...position 3 fully anti clockwise The pressure should be 14 5mbar 0 5mbar 5 8 in wg 0 2 in wg 8 Turn the control knob clockwise to the OFF position Remove the pressure gauge and refit the pressure test point sealing screw ensuring a gas tight seal 9 Test for clearance of flue products as follows a Ensure that all doors and windows are closed IMPORTANT NOTE If there is an extractor or ceiling fan in ...

Page 6: ...Supplied By www heating spares co Tel 0161 620 6677 Commissioning the Fire Page 6 ...

Page 7: ...ner as follows Figs 10 and 11 i Disconnect the compression nuts from the injectors ii Remove the 2 screws securing the burner and remove the burner out over the support bar iii Using a soft brush remove all deposits from the top of the burner and the burner ports 9 Remove and clean or replace the injectors as necessary Do not use a pin or wire for cleaning purposes 10 Clean any lint or debris from...

Page 8: ...rbs 4 COAL BED Fig 11 Remove the glass front panel as described above Remove the coal bed by carefully lifting it away from the locating pins On re assembly ensure that the coal bed is correctly located over the locating pins CAUTION The coal bed is extremely fragile and must be handled accordingly Gloves should be worn and any inhalation of the dust should be avoided Keep the coals away from chil...

Page 9: ... Height 706mm to hearth see page 6 Fig 9 Width 696mm for clearances Depth 317mm Weight 34kg unpacked HEAT INPUT 5 70kW 19 450 Btu h HEAT OUTPUT 3 6gkW 12 590 Btu h GAS GROUP G20 Natural Gas INJECTOR SIZE 230 F11 SETTING PRESSURE Cold 14 5 0 5mbar 5 8 0 2in wg THERMOCOUPLE OUTPUT 9 4 1 3mV ...

Page 10: ...Supplied By www heating spares co Tel 0161 620 6677 Bermuda SL3 Baxi Heating Ltd page 10 Fault Finding Chart Page 10 11 BAXI BERMUDA SL3 Gas Type G20 Natural Gas ...

Page 11: ... 155 758 040955 20 Knob Gas Tap Control 156 430 234544 75 Flame Failure Device Gas Tap Concentric TE SA 809 378 916 238966 76 Piezo Unit 393 734 042941 80 Encapsulated Unit Concentric TE 41 8 384 248 082462 87 230 F11 Injector 381 879 092133 88 Burner Aeromatic Baxi Special 155 949 043210 90 Lead Electrode 378 911 236209 94 Coal Bed 156 429 235149 77 Pilot Filter 205 723 082412 84 Pilot A S D Asse...

Page 12: ...t shield provided with Bermuda 57 3 M G C No 44 077 63 the boiler and fit the new controls heat shield using the Bermuda 57 3 E G C No 44 077 62 screws previously removed Bermuda 45 4 M G C No 44 077 71 Bermuda 45 4 E G C No 44 077 73 Check the data badge on the back boiler If the boiler Bermuda 57 4 M G C No 44 077 72 internal wiring is not depicted take the foil label from the kit Bermuda 57 4 E...

Page 13: ...fire is being used with a Bermuda 401 boiler unit the support brackets from the previous plate must be fitted before the fire support plate can be fixed in place Push the support plate backwards until it touches the surround or wall face and tighten the screws to lock it in position BERMUDA 45 3 57 3 45 4 57 4 Take the fire support plate from the fire unit packaging and loosely attach it above the...

Page 14: ...e for use with Bermuda 553 Propane Back Boiler appliances The instructions supplied with the back boiler contain details of gas supply requirements and electrical connections All site requirements and installation details can be found earlier in this booklet NOTE When removing the burner it is necessary to remove the right hand retaining screw and the left hand coal bed retaining pin which also re...

Reviews: