4. Remount the unit.
Caution
Use a torque wrench.
Torque applied to the anode: 8 N·m.
The retaining screws on the inspection hatch must not be over
tightened.
Tab.5
Gasket
Torque load
Lip gasket
6 N m +1/-0
Sheet gasket
15 N m
Important
Approximately 6 N·m is obtained by manipulating the box spanner
with the small lever and 15 N·m by manipulating it with the large
lever.
5. After reassembly, check the tightness of the lateral flange.
6. Proceed with commissioning.