5. UNPACKING
Carefully remove the contents. Take special care in handling the ceramic fuel effect components. Check that
all the listed parts are present and in good condition.
6. INSTALLATION OF APPLIANCE
INSTALLATION
6.1 Fireplace size.
The fireplace must comply with the requirements described in
section 4
.
6.2 Fireplace flue pull.
Visually inspect the flue for any obstruction, and that a smooth transition from the fireplace opening into the
flue is available. Close all doors and windows in the room in which the appliance is to be installed. After
confirming with a match that smoke is drawn into the flue, light a 13 gram smoke pellet and check that there is
a definite flow through the flue. Verify outside that the smoke exits from one terminal only and that the
termination is suitable. Observe, where possible, upstairs rooms and loft spaces for signs of escaping smoke
indicating a defective flue. If there is not a definite flow warm the flue for a few minutes and repeat the smoke
pellet test. If there is still no definite flow the flue may need remedial work –
Do not fit the appliance until
there is a definite flow through the flue.
Page 12
IMPORTANT
Before continuing with the installation of this gas fire the aeration setting on the burner must be
checked. This is factory set. See
section 11.1
(Servicing and parts replacement).
6.3 Fitting the burner tray trim.
Locate the burner tray trim over the front rim of the burner tray. Push the trim fully down (See
figure 4
).
Contents:
1
Burner assembly
1
Burner tray trim
1
Nut & olive for 8mm inlet pipe
2
Screws
2
Plastic screw plugs
2
Self tapping screws
1
Inlet 'T' connector
1
Ceramic fuel effect
Page 10 of 25
20/08/2012
http://www.partsarena.com/baxi/System/DATA/Dx/DS1/installation/2642/I39-2642/I...