Page 21
©
Baxi Heating U.K. Limited 2007.
8. PREPARING APPLIANCE FOR INSTALLATION
8.1 Appliance preparation.
1.
Remove any transit tape and packing and
inspect for any evidence of mishandling which
might affect the performance of the fire. Each
unit is flame tested before it leaves the factory
and as a result there may be slight
discolouration around the burner ports.
2.
Detach the burner unit from the hotbox by
removing two screws (See figure 8). Lift the
burner unit clear.
IMPORTANT
Before continuing with the installation of this gas fire the aeration setting on
the burner must be checked. The aeration is factory set, but will require
adjustment (See section 15.1).
3.
It is important that the grommet ‘H’ supplied in the loose parts pack is fitted to the
hole in the rear of the hotbox.
8.2 Fitting the foam seal (All models).
There is a length of self adhesive foam seal
supplied with the fire. This will need to be
fitted to the outer rear edges of the side and top
flanges of the hotbox. Cut the foam seal to the
required length. Be careful not to stretch the
seal when measuring. Remove the protective
backing from the foam seal and fit this to the
rear of the hotbox flange (See figure 9).
8.3 The flue restrictor.
This appliance is supplied with a flue restrictor
for use where the flue draught is excessive.
The
restrictor must not be fitted where a precast
flue or a 125mm flue liner is used
. For flue
liners greater than 125mm and all other
installations the restrictor should be fitted.
There may however, be certain exceptional
circumstances where fitting the restrictor causes
the fire to fail the spillage test. In such cases the restrictor will have to be removed.
INSTALLER GUIDE
Figure 8. Burner attachment points
Figure 9. Fitting the foam seal