background image

Sailing Yacht Bavaria 49 

 

Bavaria Yachtbau GmbH 

(39) 

– 22 –

 
You can brake or even fix the steering wheels by turning a screw home. Make always sure that this brake 
is not drawn especially when sailing with the auto pilot. This would mean an overload for the electric 
motor . 
The socket of the steering gear is integrated into the deck’s form. On the socket there is the casing of the 
wheel hub. A chain is laid over a tooth-wheel of the hub. Both chain pulls are running to the rudder gear 
which passes the adjusting force by the rudder bar to the rudder quadrant. 
Both chains are tightened each with a rope pull. It is highly recommendable to check these rope pulls 
from time to time and to retighten if necessary. 
 

2.4. Bilge pumps, bilge lines 

The chain locker is made watertight against the yacht. It is self-bailing through two holes in the skin. 
All 

BAVARIA 

yachts have got a self-bailing cockpit, too. The drain wells are situated at the rear and 

lowest part of the cockpit and are led outboard through the transom with hoses. 
 

2.4.1 Description of the pumping arrangement 

The yacht is equipped with both a manual pump and an electric bilge pump. The ist one suction hole. 
 

A draw bucket is an ideal means for bailing out water . It should always be ready in a 

cockpit seat locker. 

 

 

 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

Components of the bilge pumping installation: 
 
see drawing 2.1.3 
 

Attention 

Close all sea valves if you leave your yacht for a longer period. 
Valves being not clearly visible, like e.g. in the toilet room, should 
only be opened before use and closed short after. 

 
Warning 

In a serious situation, e.g. in case of a heavy inrush of water as a 
consequence of a collision, the pumping capacity might not be 
sufficient. Take measures for damage control with collision mats or 
other suitable means. 

Note 

In case of spherical valves a transverse lever-direction indicates:  

CLOSED  

and a longitudinal ones means : OPEN 
 

Maintenance note 

The tightness of ducts should be inspected regularly.  
Retighten all hose clips and the stuffing boxes of valves 

Summary of Contents for Bavaria 49

Page 1: ...Manual for owners and skippers Sailing yacht BAVARIA 49 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Page 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC install...

Page 3: ...of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressing technical standar...

Page 4: ...s of 4m and above and vessels largely self sufficient Certification For yachts with a length of more than 12m hull length the EC Directive intends the certification module B EC type examination in com...

Page 5: ...s the code number of the certifying body in this case the IMCI International Marine Certification Institute Brussels see Declaration of Conformity Warnings Many chapters of this manual will support a...

Page 6: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 7...

Page 7: ...tion 230 V 110 V option AC installation shore connection option safety contact plug box meeting the CEE norm 230 V 110 V battery charger 230 V AC 12 V DC with 27 A or 48 A max current option 12 V DC s...

Page 8: ...avaria 49 Bavaria Yachtbau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresa...

Page 9: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 11 1 2 2 Deck arrangement...

Page 10: ...op g track Schienenendst ck mit Umlenkblock 28 Embouts de rail gv Endstops mainsheet track Schienenendkappe 29 Winchs 40 ast Winch Winsch 30 Stoppeur Stopper Stopper 31 Winchs Winch Fallwinde 32 Aerat...

Page 11: ...zimmer Bathroom 11 Schrank Shelf 12 H ngeschrank Hanging locker 13 Doppelbett Double berth 14 Ankerkasten Chain locker 15 B cherschapp Book locker 16 B cherschapp Book locker 17 Sitz Seat 18 Schrank S...

Page 12: ...genbett Bunkbed 11 Schrank Shelf 12 Badezimmer WC Bathroom WC 13 Doppelbett Double berth 14 Ankerkasten Chain locker 15 B cherschapp Book locker 16 B cherschapp Book locker 17 Schrank Shelf 18 Etagenb...

Page 13: ...e mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional weighing lines Additionally we draw your attention to the enclosed trim i...

Page 14: ...aterlock 4 Kraftstoffzulauf Engine Fuel Intake 5 Kraftstoffr ckf hrung Feed back Fuel 6 Kraftstoffeinf llstutzen Fuel Tank filling Hose 7 Tankentl fter Fuel Tank Ventilator 8 Kraftstofffilter Fuel Fil...

Page 15: ...ressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut off properly The pump is protected by a filter which...

Page 16: ...nk pressure switch 6 Sp le Sink 7 Frischwasserpumpe Fresh water pump 8 2 Wegehahn 2 way valve 9 Waschbecken Washbasin 10 Tankentl ftung Tank venting 11 Einf llstutzen Plate inlet 12 Sp le Sink 13 Moto...

Page 17: ...et drain valve 6 F kalientank Waste water tank 7 Kugelhahn Eingang WC Toilet Water drain valve 8 Kugelhahn Ausgang F kalientank Waste water drain valve 9 El Duschpumpe El Shower pump 10 El Lenzpumpe E...

Page 18: ...drain valve 15 Kugelhahn Eingang WC Toilet Water drain valve 16 Kugelhahn Ausgang WC Toilet drain valve 17 Kugelhahn Ausgang Waschbecken Basin drain valve 18 Handlenzpumpe Operated bilge pump 2 2 Tank...

Page 19: ...aminated into the blade The post runs in two easy going and special rudder bearings The rudder is fixed by a mounting clip at the upper end of the post that also serves for the keeping of the rudder t...

Page 20: ...drain wells are situated at the rear and lowest part of the cockpit and are led outboard through the transom with hoses 2 4 1 Description of the pumping arrangement The yacht is equipped with both a m...

Page 21: ...ion of additional electric devices There are only automatic fuses used So you only have to press them in case of a breakdown If a fuse blows repeatedly you should spot the cause or consult a specialis...

Page 22: ...unction of navigation lights Have spare lamps for all navigation lights aboard Attention the electric wiring of the yacht and or corresponding wiring plans must not be changed Service and maintenance...

Page 23: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 25 2 5 6 Distribution of electric devices 3 cabin...

Page 24: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 26 5 cabin...

Page 25: ...h Bordstromkreis Batterie 140 Ah 16 Battery charger Batterieladeger t 17 Electric panel Elektro Panel 18 Main switch Batterie Hauptschalter 19 Auto pilot optional Autopilot 20 Electronic Compass Elekt...

Page 26: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 28 2 5 7 Wiring plans...

Page 27: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 29 2 5 8 Distribution plans...

Page 28: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 30 2 5 9 AC distribution...

Page 29: ...e been installed according to the German safety regulations The best by date for the soft connection hoses between the gas cylinder and the copper pipe and between copper pipe and stove is printed ont...

Page 30: ...all valves and have the installation repaired by a specialist before further use Since the flames consume oxygen a proper airing and deaeration is necessary Do not use the stove for heating the cabin...

Page 31: ...e retarding cloth which is made of glass cloth and is very useful in the case of fire caused by overheat fat It is the yacht owner s duty to have all fire extinguishers regularly checked and maintaine...

Page 32: ...s recommendable to have a stern anchor as well as sufficient mooring and towing lines with the necessary strength on board E g 1 stern folding anchor 4 fluke grapnel anchor 12 kg hot galvanised fixed...

Page 33: ...low the temperature sensor in the exhaust gas hose will release an visual and acoustic warning In this event you should stop and switch off the engine immediately until the problem has been settled se...

Page 34: ...valves a transverse lever direction indicates CLOSED And a longitudinal direction means OPEN Board ducts 3 cabin 1 K hlwasserfilter Cooling water strainer 2 Ausgang el Duschpumpe El Shower drain pump...

Page 35: ...aste water drain 6 Echolot Depth sounder 7 Ausgang WC Toilet drain 8 Eingang WC Toilet water drain 9 Ausgang Waschbecken Basin drain 10 Geschwindigkeitsmesser Speedometer 11 Ausgang Sp le Sink drain 1...

Page 36: ...reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should not turn up the engine too quickly...

Page 37: ...t dry properly where they come into contact with the caulking material leaving the surface tacky In time most paints will flake away along the line of the joint This spoils the appearance of the teak...

Page 38: ...one manufacturer that goes on well together 4 3 Wearing and spare parts As an experienced skipper you will not have difficulties in getting original spare parts If you need any help please contact the...

Page 39: ...ry Empty all cooling water of the engine and follow the instructions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engin...

Page 40: ...a skipper to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitab...

Page 41: ...f conformity engine assurance board with corresponding instruction gas test document with corresponding working instruction release checklist leaflets and description of production work working instru...

Reviews: