2.6 L.P.G. installation
The gas installation for the stove meets the European norm EN ISO 10239. Attached please find the test-
certificate.
The gas pipe leading to the stove from the standard 3 kg–gas cylinder is an 8mm copper pipe. It is placed
into a self-bailing casing moulded into the deck in the rear cockpit area. All gas pipes have been installed
according to the German safety regulations. The best-by date for the soft connection hoses between the
gas cylinder and the copper pipe and between copper pipe and stove is printed onto the hoses. They have
to be replaced after the expiry date.
The reducing valve in the gas cylinder casing has a service pressure of 30 mb. The flow rate is 1 kg/h.
2.6.1 The components (3 cabin)
1
Gasflasche mit Reduzierventil
Gas tank with valve
2
Gummischlauch
Rubber hose
3
Gaskocher mit Backofen
Gas stove with oven
4
Gaskugelhahn
Gas Stopp cock
5
Kupferrohr 6/8
Copper tube 6/8
(5 cabin)
Summary of Contents for Bavaria 49
Page 6: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 7...
Page 9: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 11 1 2 2 Deck arrangement...
Page 24: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 26 5 cabin...
Page 26: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 28 2 5 7 Wiring plans...
Page 27: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 29 2 5 8 Distribution plans...
Page 28: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 30 2 5 9 AC distribution...