Mounting the unit
Manual Single Power Unit BUM64S/A/F
Document no.: 5.01056.03
Baumüller Nürnberg Electronic GmbH & Co. KG
40
5.4
5.4.2.2 Connecting BUM64F to coolant circulation
The BUM64F unit has a pre-mounted heatsink at its back. The topmost and the lowest
threaded hole (G1/8") in the heatsink are destined for the intake and outlet of a coolant
circulation system. For the connection to the customer side of the coolant circulation use
connectors with an outside thread G1/8". Onto these connectors the customers hoses for
intake and outlet can be fitted.
The BUM64F is mounted in a switching cabinet. The heatsink connections are then situ-
ated on the back side of the unit.
Mounting the heatsink connections:
1
supply suitable connectors (material: brass, G1/8“ outside thread)
2
clean the threaded holes and connectors
3
apply silicone sealant, e.g. Loctite 5331 onto a least one (clean!) thread winding.
The silicone sealant prevents either corrosion between the different construction ma-
terials and improves also the security/tightness.
4
turn the connectors by hand into the threaded holes of the heatsink and tighten them
with the maximum admissible torque.
5
connect the intake with one of the connectors.
6
connect the outlet with the other connector.
7
check the tightness of the coolant circulation.
8
perform a leak test with the required pressure (12 bar).
CAUTION
The following
may occur
,
if you do not observe this caution information:
m
property damage.
The hazard is: damage of the connectors thread.
do not exceed the maximum torque (6 Nm) when you tighten the connectors.
NOTE
You can choose any direction of flow.
Summary of Contents for BUM64A
Page 1: ...E 5 01056 03 Manual Single Power Unit BUM64S A F ...
Page 119: ......