WARNING
Subsequent high-voltage tests must only be carried out by BAUMÜLLER NÜRNBERG GmbH. If you
want to carry out high-voltage tests for complete switch cabinet installations, disconnect all cables
from the devices prior to the test.
When an error occurs, the drive is de-energized and the motor coasts to stop. This fact must be taken
into account particularly for hoist and lifting drives.
The operator must report immediately any changes that occur which adversely affect the safety of the
unit/system.
When dismantling safety equipment during commissioning, repair and maintenance, ensure that the
machine is taken out of commission in accordance with applicable regulations. Remount and check
the safety equipment immediately after completing commissioning, repair and maintenance work.
This list does not claim to be complete for the safe operation of the unit. If you should need further
information or if special problems arise please contact BAUMÜLLER NÜRNBERG or a sales agency.
Please observe the warnings in Chapter 1 of these operating instructions.
NOTE
Prior to touching the modules, the user must discharge electrostatically to protect electronic
components from high voltages caused by electrostatic charge. This can simply be achieved by
touching a conductive, grounded part immediately before touching the electronic component.
Devices with electrostatically endangered components or modules are marked
using this label at a visible position.
Summary of Contents for BUM 62 T
Page 1: ...E 5 99009 03 Manual BUM 62 T Mono Power Unit ...
Page 6: ...6 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 10: ...Safety notes 10 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 18: ...Transportation Unpacking 18 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 22: ...Assembly 22 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 48: ...Installation 48 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 62: ...Commissioning 62 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 66: ...Maintenance 66 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Page 73: ......