K1 - 4
Transport and Installation of the Machine
1.0 Technical Data/Machine Layout/Transport and Installation of the Machine/Safety Relevant Machine Elements
After Unloading
•
Remove all packing and wrapping material
•
Check machine and accessories for damages
•
Check for missing parts
In Case of Complaints
Immediately send written note to:
•
Railway or shipping company
•
Insurance company
•
BAUM / Agency
Place of Installation
The location must meet the following requirements:
•
Vibration free location
•
Even concrete flooring, concrete property class min. (N/mm²) according to
eurocode 2: C20/25 or according to DIN1045: B 25.
•
Observe carrying capacity!
•
Avoid possible accidents of operator by uneven flooring
•
Adhere to minimum distance from buildings or peripheral equipment (see
plan)
After the Installation of the Machine
1.
Remove anti rust paint (agent: kerosene, gasoline) from the machine on
the site of installation
Note:
Do not use any sharp tools to remove anti-rust paint!
2.
Clean plastic covers only with plastic cleansing agent
3.
Final check according to check list
4.
Have handover signed
Have the machine installed by BAUM service personnel, exclusively
!
The installation of the machine requires special skills which can be gua-
ranteed only by especially trained experts of BAUM agencies.
Arbitrary working on the machine may damage the machine itself or other
material property of the user or cause accident endangering life and limb
of the staff.
The machine must be unpacked, moved, transferred and installed by
authorized BAUM Service Technicians only. Dangers might arise from the
machine itself or from its packing if it is unpacked, moved, transferred or
installed with unsuitable devices.
While the machine is unpacked, moved, transferred and installed, no other
persons must be present in the range of the machine or its packing.
The BAUM Service Technician must also take care that no unauthorized
persons work at the machine, its packing or the installation equipment.
Summary of Contents for BAUMCUT 31.5
Page 8: ...E 8...
Page 20: ...K1 12...
Page 28: ...K3 4...
Page 29: ...K4 1 Manual Operation 4 0...
Page 35: ...K5A 1 5 0 Automatic Operation...
Page 82: ...K5C 4...
Page 86: ...K5D 4...
Page 89: ...K6 1 6 0 Knife Change Knife change may only be carried out by especially authorized employees...
Page 94: ...K6 6...