SHEET 1: Copy to be returned to After-sales Department
Headquarter
F2 inspection and servicing operation
Engine serial number:
Commissioning date:
Number of hours of operation:
After 400 (P1) and 300 (P2) hours of operation, the user must have the following operations carried
out by a S. I. Moteurs Baudouin approved agent or outlet (boxes to be ticked by the agent only):
1
- Adjust the rocker arm and cross-bar play
2
- Change the engine oil
3
- Replace the oil cartridges
4
- Bleed / clean (fuel circuit)
- fuel prefilter (option)
- the water separator filter (option)
5
- Check the dry air filters
6
- Check
- belt tension
- tightness of all collars and hoses
- tightness of inspection traps
- that safety devices are working properly
7
- Operational test
NOTE: Any supplies are at the customer’s expense
AGENT
Name:
Date:
Stamp and signature
CUSTOMER
Name:
(in capitals)
Date:
Signature
Comments
Engine type:
This is mandatory for the manufacturer’s warranty to remain valid.
D
300 - Servicing operations
After 400 hours (P1 Service)
After 300 hours (P2 Service)
- 1/2 -
00350 - Edition 01 - September 1
1
Maintenance
F2
Non-contractual
illustrations
Summary of Contents for 6 M26.2
Page 4: ......
Page 6: ......
Page 8: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 32: ......
Page 34: ......
Page 38: ......
Page 42: ......
Page 48: ......
Page 58: ......
Page 68: ......
Page 70: ......
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 94: ......
Page 96: ......
Page 104: ......
Page 110: ......
Page 112: ......
Page 114: ......
Page 116: ......
Page 118: ......
Page 120: ......
Page 121: ......