
BATCHEN
Issue Date 2/11/01
QMAN0043 Installers Manual CII & C2000 Rev A.doc
- 9 -
PART 4
SITE REQUIREMENTS & PREPARATION
4.1 General
Batchen LP Gas dispensers can be installed on any new or existing Autogas site,
attended or self-serve, provided the site complies with the following requirements:
*
The location of the dispenser and associated equipment should be in accordance
with AS1596, AS1596 - Supplement 1: Siting of LP Gas Automotive Retail
Outlets and AS2430.3.
*
The pipe work installation should comply with AS2229.2 and AS1596.
*
The electrical installation should comply with AS2229.2 and AS3000.
*
If part of a self-serve system, the Console should be located such that the
operator has an unobstructed view of all fuelling positions.
Note: It is the installer's responsibility to inform the owner/site operator of regulatory
requirements. Contact your local Batchen representative if additional
information is required.
Note: Multiple holes are provided in the dispenser base for flexibility in matching
mounting bolts to existing dispenser bases.
Note: Spool pieces can be provided to adapt dispenser flange positions to existing site
pipe work. Contact your local Batchen representative for details.
4.2 Electrical Cabling
Note: The mains power supply requirements of the Dispenser (Voltage, Current,
Frequency) are specified on the Dispenser Compliance Plate.
Note: All electrical cabling must comply with AS2229.2 and AS3000.
Note: The Dispenser incorporates the facility to control the operation of a remote
Pump.
Note: The Dispenser may be connected to a remote Console for controlling and
recording transactions. If this facility ("self-serve") is required a
communications cable must be provided.