![Bastian Solutions Shoe Sorter Installation And Maintenance Manual Download Page 28](http://html1.mh-extra.com/html/bastian-solutions/shoe-sorter/shoe-sorter_installation-and-maintenance-manual_2707791028.webp)
Installation and Maintenance Manual: Shoe Sorter
_____________________________________________________________________________________________
Installation and Mai ntenance Manual: Shoe Sorter
Published October 2019
Rev.A1
28
Figure 15-Discharge Transition Assembly Positioning Detail
3.
Verify by manually advancing the slats to ensure there is no contact between the slats and the
discharge assembly nosebar.
4.
Verify that the discharge assembly prox is ON when the discharge assembly is in its rest position,
and OFF when the assembly is retracted in the flow direction.
5.1.10
Installing Guards and Guiderail
1.
2.
The chain guards mount inside the top rail of the sorter frame.
3.
Guiderail (optional) mounts outside the top rail of the sorter frame, and shares mounting bolts with
the chain guards.
a.
To install the guiderail, mount the chain guard loosely.
b.
Slide the guiderail section in between the heads of the chain guard bolts and outside of the
sorter sideframe.
c.
Do not place the guiderail between the chain guard and the sorter sideframe, as it will put the
chain guard too close to the slats.
d.
Tighten the chain guard bolts, and join the guiderail sections together with the additional bolts
provided with the guiderail.
i.
Tighten 1/4”
-20 fasteners to 8.4 ft-lb.