PRIMING 

Slightly open the bleed valve and set the manual operation at the maximum dosing frequency, to facilitate priming of the 
pump. When the product to be dosed protrudes from the purge tube, close the valve.  
Sometimes it is more effective slightly loosen the bleed valve, wait 4-5 seconds, close it, wait a few seconds and repeat the 
operation. 

 

Warning!

 Before performing any kind of operation on the pump, carefully read the HSDS of the chemical to be 

dosed, in order to define the proper behaviors to be followed, and the personal safety equipment to be worn.

 

 

 

ELECTRICAL CONNECTIONS 

The EFka300 is supplied already wired internally and complete with power cable (without plug). 
This is the only electrical connection to be performed by the customer.  
Standard power supply: 230 V

, 50 Hz, monophasic. 

 

Carefully follow all the rules of electrical safety. 
Before starting the unit, check that all electrical and plumbing connections have been properly executed. 

 

The measure inputs from pH and redox electrodes are available on BNC connectors, while inputs for level sensors 
(one for each pump) and flow sensor are available on special connectors that allow an extremely fast and easy connection 
even for unskilled personnel. 

Note:

 the pH and redox inputs should never be left open; if an input is not used, you need to short-circuit it. 

 

Level Control 

The system is supplied already configured for disabling the dosage in case of low level in the tank. The 
level control is made through a specific float sensor (optional, see “Accessories and spare parts”), to be 
connected to pins 3 and 4 of the LEV connector (see Figure). 
When the product level in the tank falls below the level sensor, the unit stops dosing and the fault is 
shown on the display. 
The alarm condition is generated with a delay of a few seconds compared to the detection of low level, to 
avoid errors due to extreme situation (such as water surface).  
Two inputs for level sensor are available, one for each pump/tank. 

 

Flow Control 

The system is supplied already configured for disabling the dosage in case of lack of water flow. 

The control is made through a SPDT contact to be connected to pins 3 and 

 of the FLOW connector 

(see Figure). A specific flow sensor is also available (optional, see “Accessories and spare parts”).  

 

 

Summary of Contents for Tebas-Economic EFka300 pH/Chlor

Page 1: ...1 Tebas Economic EFka300 pH Redox EN INSTALLATION AND MAINTENANCE INSTRUCTIONS...

Page 2: ...has to be handled by qualified personnel only Always use original spare parts for maintenance Failure to follow instructions can cause damage to the equipment and in extreme cases to people The manuf...

Page 3: ...2 PRIMING 23 ELECTRICAL CONNECTIONS 23 Level Control 23 Flow Control 23 Internal Connections for technical personnel only 23 START UP 24 VISUALIZATIONS 24 OPERATION OF THE ELECTRONIC UNIT 25 Standard...

Page 4: ...in the Technical specifications section The unit must be installed on a vertical wall and securely clamped Choose a location that allows easy calibration operations use and maintenance Place the tanks...

Page 5: ...polyester front panel Installation wall installation with supplied screws and stoppers Protection Rate IP65 Dimensions 380 x 350 x 175 mm Fixing Template 356 x 250 mm Weight approx 5 kg Dimensions FUN...

Page 6: ...o the Configuration Calibration and Manual Mode menus confirms parameter modifications Key Scrolls the available menus options in calibration and configuration modes decreases the displayed value in m...

Page 7: ...es The foot filter must be located at a minimum distance of 5 cm from the tank bottom If a dense product is dosed it is recommended to remove the small inside filter from the foot valve in order to fa...

Page 8: ...ors while inputs for level sensors one for each pump and flow sensor are available on special connectors that allow an extremely fast and easy connection even for unskilled personnel Note the pH and r...

Page 9: ...ngly with the configured working mode VISUALIZATIONS During normal operations the display shows the two measured values on the top line while the bottom row displays the status of the two pumps In mod...

Page 10: ...d related explanations see the List of Configuration Parameters section Standard Configuration The standard configuration mode allows the customer to set a series of parameters related to the normal f...

Page 11: ...ot protected by password highlighted in bold in the table above PARAMETER 01 FUNCTIONING TYPE OF THE PUMP 1 This parameter allows to set the functioning type of pump 1 typically used for the pH contro...

Page 12: ...ALARM OF PUMP 2 See parameter P11 but referred to pump 2 PARAMETER 13 START UP DELAY This parameter allows to set a start up delay which is a time of waiting before starting measurements to allow the...

Page 13: ...pressing CAL 5 The system automatically recognizes and displays the buffer value 7 01 pH 6 If necessary use the keys to adjust the calibration value 7 Press CAL to confirm the calibration or ESC to qu...

Page 14: ...s ESC at any time to exit the manual mode Warning In manual mode only one pump at a time can be activated CONTROL EXAMPLES Typical application in swimming pool control acidification when pH exceeds th...

Page 15: ...stem is unplugged Dosing Pumps For a perfect seal after about 800 hours of work it is recommended to tighten the bolts of the pump by applying a torque of 4 Nm Weekly operations Check the level of the...

Page 16: ...8019 2231 SDE Transparent methacrylate down flow probe holder with standard connections for 8x12 tubes and sampling needle 8061 0252 Flow control kit for SDE electrode holder 9700 9203 EFK1 SGV Compl...

Reviews: