- 36 -
6.2 Preparation to the installation.
CAUTION!
Before the installation check the technical data and during the installation
observe the instructions regarding safety and installation included in this
instruction manual.
Installation diagram
At the site of installation the user should prepare:
1.
Water supply system
with the 3/4 " connection and
shut-off valve
2.
Drainage
(sewer system) at a max. height of 100 mm, DN 50 connection
3.
Electric socket
230 V / 50 Hz, 16A
4.
Floor drainage
in the room
5.
Mechanical fine filter
installed upstream of the device.
Fig. 1
Cold water
supply
Water supply system
with the 3/4 "
connection and the
shut-off valve
Mechanical filter
Soft water
Power
supply unit
Gap
Sewer drain
Floor drain
Brine tank
Overflow
outlet
Flexible hose,
regeneration