- 59 -
The device must be connected to the potential levelling circuit of
efficiency conforming to the valid regulations.
The connection is the terminal fixed to the frame and marked with
the symbol in
fig. 7
.
5.6 Start-up and commissioning
•
Before the first start-up the device must be thoroughly inspected in order to confirm
the consistency of the device and its installation with the valid regulations, technical
data and recommendations for safety, included in this document.
Moreover take into consideration the following:
Temperature in the installation place must be higher than +4°C.
The device chamber must be empty.
All package elements must be completely removed, including the protective foil
on the external walls.
The venting holes must be permeable.
The parts disassembled during the installation must be reinstalled.
The main switch of the electric installation must be turned on and the gas and
water cut-off valves before the device must be opened.
Inspection during commissioning
•
The commissioning of the device is realized upon the basis of the test cycle allowing
for checking the correctness of operation and may reveal any damages or problems.
•
Start the device with use of main switch
T1
(
fig. 8, page 62
).
•
Set
baking cycle for 10 min
. at
temperature of
150°C
and
humidity 25%
.
•
Press key
T2
(
fig. 8
)
„Start/Stop“
.
•
Perform thorough inspection according to the following:
The device chamber illumination is turned on after pressing key
T5
(
fig. 8
).
It is turned off automatically after 45 seconds or after pressing key
T5
again.
The device is turned off after opening the glass door and is turned on again after
closing it.
Fig. 7