SCL Series
Installation Instructions
10070159 REV 5 - 09/19
2
800-533-3948 www.barronltg.com
1. Remove (A) 6-32 X 1/4” screws securing cover and set aside (Fig. 1-1 )
2. Slide front cover (B) forward and flip down. (Fig.1-2a, b)
(A)
(A)
Fig. 1-1
Fig. 1-2a
(B)
Fig. 1-2b
3. Stem mount option (Fig. 2-0a, b and 2-1a,b)
a. Thread 2 nuts (D) approximately 1/2” onto threaded rod (G). Add 1 lock washer (C). Insert threaded rod (G) into top
of enclosure as shown in Fig. 2-0.
b. Using nuts (D) to hold threaded rod (G) in place thread lock nut (F) in place.
Note:
Must thread lock nut (F) in place correctly to avoid failure. See Figures 2-0a and 2-0b.
c. Once locknut (F) is securely in place back up 2nd nut (D) to appropriate position. Tighten 1st nut (D) securely in
place on top of enclosure.
d. Thread 2nd lock washer onto carriage bolt.
e. Guide (2) mounting plates (E) onto threaded rod (G)
f. Thread 3rd lock washer (C) and 3rd nut (D) onto threaded rod (G)
g. Adjust mounting brackets to desired spacing and tighten nuts.
4. Remove desired knockout on back of enclosure and mount to junction box using hardware supplied with junction box.
5. Make electrical connections.
All electrical connections should be made inside the J-box.
Make electrical connection as follows: (Fig. 3-1)
Note:
Cap unused leads to prevent shorting.
120VAC
White - Common
Black - 120V
Green - Ground
277VAC
White - Common
Orange - 277V
Green - Ground
Fig. 3-1a
White
(Neutral)
Black
(for 120V)
Orange
(for 277V)
Green
(Ground)