SCL Series
Installation Instructions
10070159 REV 5 - 09/19
4
800-533-3948 www.barronltg.com
SELF-TEST/SELF-DIAGNOSTIC
OPERATING INSTRUCTIONS
KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE
I M P O R T A N T:
Once all emergency lamps have been connected to the unit equipment, apply normal AC power and
charge for 24 hours.
For units equipped with G2 and the tri-color LED indicator: Following installation and after AC power has been supplied,
charge for 48 hours, then press and hold the test button until the LED indicator turns orange. This calibrates the unit
equipment for the proper load.
Operation
The purpose of this option is to provide Self-testing and Self-diagnostic capabilities to the unit equipment. At
predetermined intervals, the unit equipment will automatically switch into battery mode. The unit equipment will also
perform various Self-diagnostic tests of the unit. Visual signaling will alert maintenance personnel to a fault of the unit
equipment electronics, emergency lamp(s), battery and/or battery charger. The circuitry continuously monitors the
operating condition of the unit equipment and battery charging circuit/battery supply voltage. Refer to Table 1 for units
equipped with a tri-color LED indicator. Refer to Table 2 for units equipped with a numeric indicator.
Self-Test Features
• The unit equipment will automatically switch to battery mode every 28 days for a period of 1 minute.
• The unit equipment will automatically switch to battery mode every 6 months for a period of 90 minutes.
Manual Test Features
• Press the TEST BUTTON momentarily for a 2 second test. (tri-color LED unit only)
• Press the TEST BUTTON until the LED turns ORANGE or the numeric indicator shows “7” for a manual 1 minute test.
• Press the TEST BUTTON until the LED flashes RED/GREEN, (tri-color LED unit only) for manual 90 minute test.
LED Indication
Steady
Pulse
Steady
Pulse
Steady
Pulse
LED Color
LED Color
Green
Green
Red
Red
Orange
Orange
Red/Green
Unit Condition
Float Charge
Hi-Rate Charge
Low Batt Voltage
Emer Lamp Failure
No AC Power
Charge Failure
1 Minute Test
Batt Disconnected
90 Minute Test
Comment
Batt Fully Charged
Batt Under High-Rate Charge
Replace Battery
Check AC Connection
Replace Transformer
1 Min Test Every 28 Days
Check Batt Connections
90 Min Test Every 6 Months
Replace Damaged or
Missing Lamps
Table 1 - Tri-Color LED Indicator
CHARGED
0 Float charging
CHARGING 1 Hi rate charging
EM/BATT 2 Discharging
CHRG FAIL
3 Charger failure
DISC BATT
4 Battery not connected
LAMP FAIL 5 Lamp failure
LOW BATT 6 Low battery voltage
1 MIN TEST 7 Manual testing
90 MIN TEST 8 Self testing
STATUS LEDGE Condition
Table 2 - Numeric Indicator
Bottom of Unit
Bottom of Unit
Numeric Indicator
Tri-Color LED