19" rack mount conversion kit - Barrett P/N BCA90010
Referring to the diagram, first attach the left and right hand side plates to the 19” front panel
using the ten M4 x 6 pan head screws (items 2 on diagram), with M4 nylon washers (items
3 on diagram), placed under each screw. (make sure the Barrett logo on the front panel is
orientated correctly when assembling).
Screw the ”D” handles on to the front panel using the screws supplied (items 4 on diagram).
When the assembly is complete mount the transceiver, power supply, modem or antenna select
unit into the tray from the rear, making sure the front panel mates into the milled cut-out in the
rear of the 19” front panel. Secure the transceiver in place with the remaining four M4 x 12 pan
head screws (items marked 1 on diagram).
Kit comprises:-
-
1 x left hand side plate
-
1 x right hand side plate
MW-08440 -
1 x 19” front panel
MW-08095 -
2 x ”D” handles
NB-04597
-
10 x M4 x 6 pan head phillips screws (marked 2 on diagram)
NB-04595
-
10 x M4 nylon washers (marked 3 on diagram)
NB-04617
-
4 x M4 x 12 pan head pozidrive screws (marked 1 on diagram)
NB-04598
-
4 x M6 x 16 Rack mount pan head pozidrive screws
NB-04629
-
4 x M6 Captive nut.
NB-00006
-
4 x M6 nylon washers
NB-00003
-
4 x M4x 16 pan head pozidrive Screws (marked 4 on diagram)
BARRETT 950 HF TRANSCEIVER
PAGE 136
1
4
3
2
MW-08450 {