background image

BAR LOW  T Y R IE

                                                        

                                

        

quality since 1920

www.teak.com

   

 

 

 

 

 

 

 

                                          Page 7 of 16

Assembling the roof framework

6

B-B

View C-C

View B-B

Install the middle plastic stub truss on 

The

upper hole can be used in time if more pressure needs to 

be exerted by the middle truss onto the roof fabric.

the lower hole.

Lay the trusses on top of the beam assembly in the order and orientation shown by the 

diagram above. Consult views B-B, C-C, D-D and E-E for specific detail. Then turn to the 

next page for a description on how to fix each trusses to the hinges.

E-E

D-D

Transverse

Groove Should be

 Facing Downwards

 Support

T2

T2

T3

T3

T4

T5

T4

View D-D

View E-E

C-C

Holes used for 

Lever Arm

and Dummy 

Lever Arm

(see Step 9)

Holes used for Lever Arm

and Dummy Lever Arm

(see Step 9)

Summary of Contents for 9111210

Page 1: ...llation is recommended with no fewer than two people Always maintain a clean organized work area Make sure you have the right tools and materials Barlow Tyrie supplies the appropriate fasteners upon r...

Page 2: ...Assembly overview BAR LOW T Y R IE quality since 1920 www teak com Page 2 of 16...

Page 3: ...sub kits 16x 002 4x AL005 Roof Hinge Roof Hinge 1x KC 02L 1x KC 02R 1x PL005 1x PL005 Roof Hinge Cover Roof Hinge Cover Plastic Corner Bracket 4x K4 01 8x 025 16x 015 Plastic Corner Insert 10x PL007 K...

Page 4: ...luded with curtains PL101 20x R3 Velcro Strips Carriage Bolt 5 16 x 2 5 16 Flat Washer 16x 003 16x 007 16x 012 5 16 Nylon Lock Nut 5 16 Nylon Lock Nut Nylon Bushing 5 16 5 16 Flat Washer 5x 012 10x 00...

Page 5: ...ges on the beams B1 by first inserting two tab nuts into the bottom interior groove of both beams Then slide the tab nuts till the mid section of the beams Install the roof hinges on both beams using...

Page 6: ...rts PL007 at each end of the transverse roof supports T1 and T2 as shown in the figure above You will need a rubber hammer to insert them properly Complete the assembly by inserting the trusses T3 T4...

Page 7: ...the lower hole Lay the trusses on top of the beam assembly in the order and orientation shown by the diagram above Consult views B B C C D D and E E for specific detail Then turn to the next page for...

Page 8: ...OP VIEW See Through View View F F 004 006 002 006 KC 02L 014 Install the trusses on the hinge using hardware shown in views B B Notice that only one side is shown Repeat this step on the other hinge O...

Page 9: ...the top right diagrams This step may require a second person or a ladder to lift the roof assembly in order to fix all four corner posts P1 See diagrams below for further assembly steps To complete th...

Page 10: ...6 washers CONCRETE SOIL OPTION B CONCRETE CEMENT FLOOR The Permo Lock anchoring system is the recommended method that offers a strong permanent solution for anchoring your shelter and to protect it ag...

Page 11: ...in the coupling nut without turning the rod and anchor The maximum opening of the Permo Lock anchor occurs when the rod extends 3 8 2cm above the coupling nut Drill a 1 x 19 2 5cm x 50cm hole at each...

Page 12: ...on the T4 truss assembly on the opening side Locate the proper position of the fork by using the fork installation guide as shown in views H H Then use the self tapping screw 016 to fix the fork on th...

Page 13: ...10 018 PL013 Insert velcro strips at every 16 in the top groove of the beams Then fix the valance to the velcro strips R3 Start from one end of the valance and work your way around the frame assembly...

Page 14: ...ocket of the fabric as shown in View M M Then raise the truss assembly and push the flat bar and fabric into the groove of the transverse truss T2 Then fix the velcro strip around the 2 roof supports...

Page 15: ...ration Pulleys should be facing towards the curtain side on which the zipper is located see above steps Then install each curtain sections into the provided beam slots as shown by left hand diagram Af...

Page 16: ...7 600 f 44 0 870 460 1100 Barlow Tyrie Inc 1263 Glen Avenue Suite 230 Moorestown NJ 08057 8101 USA t 1 856 273 7878 f 1 856 273 9199 15 Install the decorative curtains on the iterior or exterior rail...

Reviews: