Manual 2100-587C
Page
37 of 59
30. SEQUENCE OF OPERATION –
HEATING
On a call for heat from the thermostat, the induced
draft blower is energized. Once sufficient draft is
established, the pressure switch contacts close and the
ignition system is energized. The direct spark ignitor
will be energized allowing gas to flow. At the same
time the main valve is energized, a 30-second blower
delay timer is activated.
After this delay, the heating speed blower relay
energizes. The blower will begin operating and
remain in operation until the set delay time after the
call for heat has been satisfied. This timing sequence
guarantees blower on, blower off operation.
This unit is equipped with a flame roll-out switch,
which is wired in series with the control circuit. This
is a manual reset switch and is used for the purpose
of preventing possible fire hazard in the event of a
system malfunction. If this switch has opened the
control circuit, there could be a possible system
malfunction. Some of the conditions that might cause
a roll-out to occur are blockage or sooting of primary
heat exchanger, overfiring of furnace due to improper
main burner orifices or incorrect manifold pressure,
insufficient combustion air, or installation deficiencies
with respect to return air duct design or sizing.
Once the problem has been resolved, reset the switch
by pressing down on the reset button on top of the
switch. See Figure 16 for additional information.
31. SEQUENCE OF OPERATION –
COOLING
NON-ECONOMIZER
Stage 1 (Y1) cooling call activates Step 1 (partial
capacity, 66%) of compressor capacity.
Stage 2 (Y2) cooling call activates Step 2 (full capacity,
100%) of compressor capacity.
WITH ECONOMIZER
Stage 1 (Y1) cooling call goes to economizer controls
for decision:
- If Enthalpy Control decides outdoor conditions
are suitable for free cooling, the economizer will
operate.
• If Stage 2 cooling call is issued during
economizer operation, the economizer will
close and the compressor will go straight to
Step 2 full capacity operation.
- If Enthalpy Control decides outdoor conditions
are not suitable for free cooling, the economizer
will not operate (or close) and Step 1 of the
compressor will operate.
• If Stage 2 cooling call is issued, the
compressor will shift to Step 2 full cooling
capacity
operation.
FIGURE 16
SEQUENCE OF OPERATION
ELECTRONIC BLOWER CONTROL
Action
System Response
Thermostat calls for heat
(W terminal is energized).
• Combustion air blower is energized.
• Air proving switch makes. Airflow is established.
• Ignition system is energized.
• Gas valve opens and main burner lights.
• Heat fan on delay timing begins. When timing is complete, the circulating fan is
energized at heat speed.
Thermostat ends call for heat.
• Ignition system is de-energized and gas valve closes.
• Combustion air blower is de-energized after postpurge timing.
• Heat fan off delay timing begins. When timing is complete, the circulating fan is
de-energized.
Thermostat begins call for cool
(G and Y terminals re-energized).
• Cooling contactor is energized.
• Circulating fan is energized on cool speed after cool fan on delay timing.
Thermostat begins call for fan
(G terminal is de-energized).
• Circulating fan is de-energized
Limit (flame rollout) opens.
• Thermostat and ignition system are de-energized and gas valve closes.
• Combustion air blower and circulating fan heat speed are energized.
Limit (auto reset) or flame rollout
(manual reset) circuit closed.
• Combustion air blower remains energized for postpurge timing.
• The circulation fan remains energized for the selected delay off timing.
• Normal operation resumes.
Summary of Contents for WG3S2-A
Page 11: ...Manual 2100 587C Page 11 of 59 FIGURE 2A MOUNTING INSTRUCTIONS FOR WG3S2...
Page 12: ...Manual 2100 587C Page 12 of 59 FIGURE 2B MOUNTING INSTRUCTIONS FOR WG4S2 AND WG5S2...
Page 15: ...Manual 2100 587C Page 15 of 59 FIGURE 6 COMMON WALL MOUNTING INSTALLATIONS...
Page 25: ...Manual 2100 587C Page 25 of 59 FIGURE 11 GAS PIPE CONNECTION...